A platform for research: civil engineering, architecture and urbanism
PIER STUD PREFABRICATED POURING SYSTEM, AND OFFSITE POURING METHOD THEREOF
A pier stud prefabricated pouring system, and an offsite pouring method thereof. The system comprises a bottom mold assembly (10); four side mold assembles and four washing assemblies are alternately distributed on the periphery of the bottom mold assembly (10); the side mold assembles comprise a first side mold assembly (20) and three second side mold assemblies (30); and the washing assemblies comprise a first washing assembly (40) and three second washing assemblies (50). In a prefabrication site, the pier stud prefabricated pouring system is used to fabricate a pouring body (60); and the pouring body (60) is conveyed to a road and bridge engineering construction site by means of a conveying system. By replacing on-site pouring with factory standardized pouring, the limitation of pouring is small and pouring is not affected by factors, such as weather. The opening and closing of each template are achieved by means of mechanical driving, and thus, the pouring efficiency is high, the pouring precision is high, potential safety hazards are small, avoidance is achieved in a pouring process without manual command, and the opening and closing actions of each template are smooth and reliable; moreover, the position of a bottom template can be adjusted, thereby being capable of further improving the pouring precision and the versatility of pouring.
L'invention concerne un système préfabriqué de coulée de montant de pile et un procédé de coulée hors site correspondant. Le système comprend un ensemble moule inférieur (10) ; quatre ensembles moules latéraux et quatre ensembles de lavage sont répartis en alternance sur la périphérie de l'ensemble moule inférieur (10) ; les ensembles moules latéraux comprennent un premier ensemble moule latéral (20) et trois deuxièmes ensembles moules latéraux (30) ; et les ensembles de lavage comprennent un premier ensemble de lavage (40) et trois deuxièmes ensembles de lavage (50). Dans un site de préfabrication, le système préfabriqué de coulée de montant de pile est utilisé pour fabriquer un corps de coulée (60) ; et le corps de coulée (60) est transporté vers un site de construction d'ingénierie routière et des ponts au moyen d'un système de transport. Par le remplacement de la coulée sur site par une coulée standardisée en usine, la limitation de la coulée est faible et la coulée n'est pas affectée par des facteurs, tels que les intempéries. L'ouverture et la fermeture de chaque gabarit sont réalisées par entraînement mécanique et ainsi, l'efficacité de coulée est élevée, la précision de coulée est élevée, les risques de sécurité potentiels sont faibles, la prévention est atteinte dans un procédé de coulée sans commande manuelle et les actions d'ouverture et de fermeture de chaque gabarit sont régulières et fiables ; de plus, la position d'un gabarit inférieur peut être ajustée, ce qui permet d'améliorer davantage la précision de la coulée et la polyvalence de la coulée.
一种墩柱的预制浇筑系统及其异地浇筑方法,包括底模组件(10),底模组件(10)的四周设有交替分布的四个侧模组件和四个清洗组件,侧模组件包括一个第一侧模组件(20)和三个第二侧模组件(30),清洗组件包括一个第一清洗组件(40)和三个第二清洗组件(50);在预制地使用墩柱的预制浇筑系统制作获得浇筑体(60),通过运输系统将浇筑体(60)运送到路桥工程建设地。通过工厂标准化浇筑替代现场浇筑,浇筑所受的限制小,不受天气等因素的影响,通过机械化驱动实现各模板的开合,浇筑效率高、浇筑精度高、安全隐患小,且浇筑过程中无需人工指挥实现避让,各模板的开合动作顺畅可靠,且底模板的位置可以调节,能进一步提高浇筑精度以及浇筑的通用性能。
PIER STUD PREFABRICATED POURING SYSTEM, AND OFFSITE POURING METHOD THEREOF
A pier stud prefabricated pouring system, and an offsite pouring method thereof. The system comprises a bottom mold assembly (10); four side mold assembles and four washing assemblies are alternately distributed on the periphery of the bottom mold assembly (10); the side mold assembles comprise a first side mold assembly (20) and three second side mold assemblies (30); and the washing assemblies comprise a first washing assembly (40) and three second washing assemblies (50). In a prefabrication site, the pier stud prefabricated pouring system is used to fabricate a pouring body (60); and the pouring body (60) is conveyed to a road and bridge engineering construction site by means of a conveying system. By replacing on-site pouring with factory standardized pouring, the limitation of pouring is small and pouring is not affected by factors, such as weather. The opening and closing of each template are achieved by means of mechanical driving, and thus, the pouring efficiency is high, the pouring precision is high, potential safety hazards are small, avoidance is achieved in a pouring process without manual command, and the opening and closing actions of each template are smooth and reliable; moreover, the position of a bottom template can be adjusted, thereby being capable of further improving the pouring precision and the versatility of pouring.
L'invention concerne un système préfabriqué de coulée de montant de pile et un procédé de coulée hors site correspondant. Le système comprend un ensemble moule inférieur (10) ; quatre ensembles moules latéraux et quatre ensembles de lavage sont répartis en alternance sur la périphérie de l'ensemble moule inférieur (10) ; les ensembles moules latéraux comprennent un premier ensemble moule latéral (20) et trois deuxièmes ensembles moules latéraux (30) ; et les ensembles de lavage comprennent un premier ensemble de lavage (40) et trois deuxièmes ensembles de lavage (50). Dans un site de préfabrication, le système préfabriqué de coulée de montant de pile est utilisé pour fabriquer un corps de coulée (60) ; et le corps de coulée (60) est transporté vers un site de construction d'ingénierie routière et des ponts au moyen d'un système de transport. Par le remplacement de la coulée sur site par une coulée standardisée en usine, la limitation de la coulée est faible et la coulée n'est pas affectée par des facteurs, tels que les intempéries. L'ouverture et la fermeture de chaque gabarit sont réalisées par entraînement mécanique et ainsi, l'efficacité de coulée est élevée, la précision de coulée est élevée, les risques de sécurité potentiels sont faibles, la prévention est atteinte dans un procédé de coulée sans commande manuelle et les actions d'ouverture et de fermeture de chaque gabarit sont régulières et fiables ; de plus, la position d'un gabarit inférieur peut être ajustée, ce qui permet d'améliorer davantage la précision de la coulée et la polyvalence de la coulée.
一种墩柱的预制浇筑系统及其异地浇筑方法,包括底模组件(10),底模组件(10)的四周设有交替分布的四个侧模组件和四个清洗组件,侧模组件包括一个第一侧模组件(20)和三个第二侧模组件(30),清洗组件包括一个第一清洗组件(40)和三个第二清洗组件(50);在预制地使用墩柱的预制浇筑系统制作获得浇筑体(60),通过运输系统将浇筑体(60)运送到路桥工程建设地。通过工厂标准化浇筑替代现场浇筑,浇筑所受的限制小,不受天气等因素的影响,通过机械化驱动实现各模板的开合,浇筑效率高、浇筑精度高、安全隐患小,且浇筑过程中无需人工指挥实现避让,各模板的开合动作顺畅可靠,且底模板的位置可以调节,能进一步提高浇筑精度以及浇筑的通用性能。
PIER STUD PREFABRICATED POURING SYSTEM, AND OFFSITE POURING METHOD THEREOF
SYSTÈME PRÉFABRIQUÉ DE COULÉE DE MONTANT DE PILE ET PROCÉDÉ DE COULÉE HORS SITE CORRESPONDANT
一种墩柱的预制浇筑系统及其异地浇筑方法
CHEN JINPIN (author)
2022-02-17
Patent
Electronic Resource
Chinese
Pier stud prefabricating pouring system and remote pouring method thereof
European Patent Office | 2020
|Concrete pumping and pouring system and method for pier stud bent cap
European Patent Office | 2024
|Pouring process of hydraulic concrete prefabricated ship lock pier assembly type component
European Patent Office | 2023
|