INSTALLATION METHOD FOR PREFABRICATED CAPPING BEAM OF VIADUCT
An installation method for a prefabricated capping beam of a viaduct, the installation method comprising the following steps: S1. sticking observation labels, involving sticking the observation labels to the end of a prefabricated capping beam, the central point of a side surface of the prefabricated capping beam and the central point of an upright post; S2. pre-assembling, involving hoisting the prefabricated capping beam to the upper end of the upright post, observing the observation labels to adjust the position of the prefabricated capping beam on the upright post, and marking the position of the prefabricated capping beam after adjusting to a desired position; and S3. performing formal assembly, involving hoisting the marked prefabricated capping beam, grouting from the top of the upright post, hoisting the capping beam to the top of the upright post after grouting, correcting according to the observation labels and the marks, and then performing formal assembly of the prefabricated capping beam to the upright post. According to the method, multiple observation labels are provided on the prefabricated capping beam and the upright post, both pre-assembly and formal assembly are performed for the prefabricated capping beam, and during the assembly process, the pre-positioning and re-checking of the verticality, flatness and elevation of the capping beam are performed by means of observing the marks, thereby greatly improving the assembly precision.
L'invention concerne un procédé d'installation pour une poutre de couronnement préfabriquée d'un viaduc, le procédé d'installation comprenant les étapes suivantes : S1. coller des vignettes d'observation, consistant à coller les vignettes d'observation sur l'extrémité d'une poutre de couronnement préfabriquée, le point central d'une surface latérale de la poutre de couronnement préfabriquée et le point central d'un poteau dressé; S2. pré-assembler, consistant à lever la poutre de couronnement préfabriquée à l'extrémité supérieure du poteau dressé, observer les vignettes d'observation pour ajuster la position de la poutre de couronnement préfabriquée sur le poteau dressé, et marquer la position de la poutre de couronnement préfabriquée après ajustement jusqu'à une position souhaitée; et S3. réaliser un assemblage formel, consistant à lever la poutre de couronnement préfabriquée marquée, jointoyer à partir du haut du poteau dressé, lever la poutre de couronnement jusqu'en haut du poteau dressé après jointoiement, corriger selon les vignettes d'observation et les marques, et réaliser ensuite un assemblage formel de la poutre de couronnement préfabriquée sur le poteau dressé. Selon le procédé, de multiples vignettes d'observation sont ménagées sur la poutre de couronnement préfabriquée et le poteau dressé, à la fois un pré-assemblage et un assemblage formel sont réalisés pour la poutre de couronnement préfabriquée, et pendant le processus d'assemblage, le pré-positionnement et la revérification de la verticalité, de la planéité et de l'élévation de la poutre de couronnement sont réalisés au moyen de l'observation des marques, ce qui améliore considérablement la précision d'assemblage.
一种高架桥预制盖梁安装方法,包括以下步骤:S1、粘贴观测标:在预制盖梁的端头、预制盖梁侧面中心点、立柱中心点粘贴观测标;S2、预拼装;将预制盖梁吊装到立柱上端,然后通过观察观测标调整预制盖梁在立柱上的位置,调整至所需位置后对预制盖梁位置进行标记;S3、正式拼装:将标记后的预制盖梁吊起,然后进行立柱顶座浆,座浆后将盖梁吊装至立柱顶,并根据观测标、标记进行校正,进而完成预制盖梁与立柱的正式拼接,该方法通过在预制盖梁以及立柱上设置多处观察标志,同时对预制盖梁进行预拼接、正式拼接,而且在拼接的过程中通过观察标志对盖梁的垂直度、平面度、标高进行预定位以及复核,进而极大的提高了拼装精度。
INSTALLATION METHOD FOR PREFABRICATED CAPPING BEAM OF VIADUCT
An installation method for a prefabricated capping beam of a viaduct, the installation method comprising the following steps: S1. sticking observation labels, involving sticking the observation labels to the end of a prefabricated capping beam, the central point of a side surface of the prefabricated capping beam and the central point of an upright post; S2. pre-assembling, involving hoisting the prefabricated capping beam to the upper end of the upright post, observing the observation labels to adjust the position of the prefabricated capping beam on the upright post, and marking the position of the prefabricated capping beam after adjusting to a desired position; and S3. performing formal assembly, involving hoisting the marked prefabricated capping beam, grouting from the top of the upright post, hoisting the capping beam to the top of the upright post after grouting, correcting according to the observation labels and the marks, and then performing formal assembly of the prefabricated capping beam to the upright post. According to the method, multiple observation labels are provided on the prefabricated capping beam and the upright post, both pre-assembly and formal assembly are performed for the prefabricated capping beam, and during the assembly process, the pre-positioning and re-checking of the verticality, flatness and elevation of the capping beam are performed by means of observing the marks, thereby greatly improving the assembly precision.
L'invention concerne un procédé d'installation pour une poutre de couronnement préfabriquée d'un viaduc, le procédé d'installation comprenant les étapes suivantes : S1. coller des vignettes d'observation, consistant à coller les vignettes d'observation sur l'extrémité d'une poutre de couronnement préfabriquée, le point central d'une surface latérale de la poutre de couronnement préfabriquée et le point central d'un poteau dressé; S2. pré-assembler, consistant à lever la poutre de couronnement préfabriquée à l'extrémité supérieure du poteau dressé, observer les vignettes d'observation pour ajuster la position de la poutre de couronnement préfabriquée sur le poteau dressé, et marquer la position de la poutre de couronnement préfabriquée après ajustement jusqu'à une position souhaitée; et S3. réaliser un assemblage formel, consistant à lever la poutre de couronnement préfabriquée marquée, jointoyer à partir du haut du poteau dressé, lever la poutre de couronnement jusqu'en haut du poteau dressé après jointoiement, corriger selon les vignettes d'observation et les marques, et réaliser ensuite un assemblage formel de la poutre de couronnement préfabriquée sur le poteau dressé. Selon le procédé, de multiples vignettes d'observation sont ménagées sur la poutre de couronnement préfabriquée et le poteau dressé, à la fois un pré-assemblage et un assemblage formel sont réalisés pour la poutre de couronnement préfabriquée, et pendant le processus d'assemblage, le pré-positionnement et la revérification de la verticalité, de la planéité et de l'élévation de la poutre de couronnement sont réalisés au moyen de l'observation des marques, ce qui améliore considérablement la précision d'assemblage.
一种高架桥预制盖梁安装方法,包括以下步骤:S1、粘贴观测标:在预制盖梁的端头、预制盖梁侧面中心点、立柱中心点粘贴观测标;S2、预拼装;将预制盖梁吊装到立柱上端,然后通过观察观测标调整预制盖梁在立柱上的位置,调整至所需位置后对预制盖梁位置进行标记;S3、正式拼装:将标记后的预制盖梁吊起,然后进行立柱顶座浆,座浆后将盖梁吊装至立柱顶,并根据观测标、标记进行校正,进而完成预制盖梁与立柱的正式拼接,该方法通过在预制盖梁以及立柱上设置多处观察标志,同时对预制盖梁进行预拼接、正式拼接,而且在拼接的过程中通过观察标志对盖梁的垂直度、平面度、标高进行预定位以及复核,进而极大的提高了拼装精度。
INSTALLATION METHOD FOR PREFABRICATED CAPPING BEAM OF VIADUCT
PROCÉDÉ D'INSTALLATION POUR POUTRE DE COURONNEMENT PRÉFABRIQUÉE DE VIADUC
一种高架桥预制盖梁安装方法
ZHANG MINGXU (author) / LIU MIMI (author) / MENG ZHIHONG (author) / LIAO ZHILIANG (author) / WANG FUBIAO (author) / ZHANG WANLAI (author)
2022-05-05
Patent
Electronic Resource
Chinese