A platform for research: civil engineering, architecture and urbanism
LOW-ENERGY-CONSUMPTION CARBON-ENRICHED CEMENT PRODUCTION SYSTEM AND METHOD FOR PRODUCING CEMENT CLINKER
A low-energy-consumption carbon-enriched cement production system and a method for producing cement clinker. The system comprises: a raw material preheating and pre-decomposing system, and a smoke chamber (1), a rotary kiln (2) and a cooling machine (3) which are successively in communication with each other, wherein the raw material preheating and pre-decomposing system comprises a decomposing furnace (4) and a pre-heater (5); the cooling machine (3) comprises a first cooling area (301) and a second cooling area (302), the first cooling area (301) comprises a first cooling sub-area (3011) and a second cooling sub-area (3012), mixed gas of pure oxygen and high-concentration carbon dioxide flue gas is introduced into an inlet of the first cooling sub-area (3011), high-concentration carbon dioxide flue gas is introduced into an inlet of the second cooling sub-area (3012), and air is introduced into an inlet of the second cooling area (302), so that the problems of the easiness in air channeling and high energy consumption between the first cooling area (301) and the second cooling area (302) in carbon dioxide enrichment technology of an existing cement kiln are solved.
Système de production de ciment enrichi en carbone à faible consommation d'énergie et procédé de production de clinker de ciment. Le système comprend : un système de préchauffage et de pré-décomposition de matière première, et une chambre de fumée (1), un four rotatif (2) et une machine de refroidissement (3) qui sont successivement en communication les uns avec les autres, le système de préchauffage et de pré-décomposition de matière première comprenant un four de décomposition (4) et un dispositif de préchauffage (5) ; la machine de refroidissement (3) comprend une première zone de refroidissement (301) et une seconde zone de refroidissement (302), la première zone de refroidissement (301) comprend une première sous-zone de refroidissement (3011) et une seconde sous-zone de refroidissement (3012), un gaz mixte d'oxygène pur et de gaz de fumée de dioxyde de carbone à haute concentration est introduit dans une entrée de la première sous-zone de refroidissement (3011), un gaz de fumée de dioxyde de carbone à haute concentration est introduit dans une entrée de la seconde sous-zone de refroidissement (3012) et de l'air est introduit dans une entrée de la seconde zone de refroidissement (302) de sorte que les problèmes de facilité de canalisation d'air et de consommation d'énergie élevée entre la première zone de refroidissement (301) et la seconde zone de refroidissement (302) dans la technologie d'enrichissement en dioxyde de carbone d'un four à ciment existant sont résolus.
一种低能耗碳富集水泥生产系统及生产水泥熟料的方法,系统包括生料预热预分解系统以及依次连通的烟室(1)、回转窑(2)和冷却机(3);生料预热预分解系统包括分解炉(4)和预热器(5);冷却机(3)包括第一冷却区(301)和第二冷却区(302),第一冷却区(301)包括第一冷却分区(3011)和第二冷却分区(3012),第一冷却分区(3011)的进口通入纯氧和高浓度二氧化碳烟气的混合气,第二冷却分区(3012)的进口通入高浓度二氧化碳烟气,第二冷却区(302)的进口通入空气,解决了现有的水泥窑的二氧化碳富集技术存在的第一冷却区(301)内和第二冷却区(302)之间容易窜风、能耗高的问题。
LOW-ENERGY-CONSUMPTION CARBON-ENRICHED CEMENT PRODUCTION SYSTEM AND METHOD FOR PRODUCING CEMENT CLINKER
A low-energy-consumption carbon-enriched cement production system and a method for producing cement clinker. The system comprises: a raw material preheating and pre-decomposing system, and a smoke chamber (1), a rotary kiln (2) and a cooling machine (3) which are successively in communication with each other, wherein the raw material preheating and pre-decomposing system comprises a decomposing furnace (4) and a pre-heater (5); the cooling machine (3) comprises a first cooling area (301) and a second cooling area (302), the first cooling area (301) comprises a first cooling sub-area (3011) and a second cooling sub-area (3012), mixed gas of pure oxygen and high-concentration carbon dioxide flue gas is introduced into an inlet of the first cooling sub-area (3011), high-concentration carbon dioxide flue gas is introduced into an inlet of the second cooling sub-area (3012), and air is introduced into an inlet of the second cooling area (302), so that the problems of the easiness in air channeling and high energy consumption between the first cooling area (301) and the second cooling area (302) in carbon dioxide enrichment technology of an existing cement kiln are solved.
Système de production de ciment enrichi en carbone à faible consommation d'énergie et procédé de production de clinker de ciment. Le système comprend : un système de préchauffage et de pré-décomposition de matière première, et une chambre de fumée (1), un four rotatif (2) et une machine de refroidissement (3) qui sont successivement en communication les uns avec les autres, le système de préchauffage et de pré-décomposition de matière première comprenant un four de décomposition (4) et un dispositif de préchauffage (5) ; la machine de refroidissement (3) comprend une première zone de refroidissement (301) et une seconde zone de refroidissement (302), la première zone de refroidissement (301) comprend une première sous-zone de refroidissement (3011) et une seconde sous-zone de refroidissement (3012), un gaz mixte d'oxygène pur et de gaz de fumée de dioxyde de carbone à haute concentration est introduit dans une entrée de la première sous-zone de refroidissement (3011), un gaz de fumée de dioxyde de carbone à haute concentration est introduit dans une entrée de la seconde sous-zone de refroidissement (3012) et de l'air est introduit dans une entrée de la seconde zone de refroidissement (302) de sorte que les problèmes de facilité de canalisation d'air et de consommation d'énergie élevée entre la première zone de refroidissement (301) et la seconde zone de refroidissement (302) dans la technologie d'enrichissement en dioxyde de carbone d'un four à ciment existant sont résolus.
一种低能耗碳富集水泥生产系统及生产水泥熟料的方法,系统包括生料预热预分解系统以及依次连通的烟室(1)、回转窑(2)和冷却机(3);生料预热预分解系统包括分解炉(4)和预热器(5);冷却机(3)包括第一冷却区(301)和第二冷却区(302),第一冷却区(301)包括第一冷却分区(3011)和第二冷却分区(3012),第一冷却分区(3011)的进口通入纯氧和高浓度二氧化碳烟气的混合气,第二冷却分区(3012)的进口通入高浓度二氧化碳烟气,第二冷却区(302)的进口通入空气,解决了现有的水泥窑的二氧化碳富集技术存在的第一冷却区(301)内和第二冷却区(302)之间容易窜风、能耗高的问题。
LOW-ENERGY-CONSUMPTION CARBON-ENRICHED CEMENT PRODUCTION SYSTEM AND METHOD FOR PRODUCING CEMENT CLINKER
SYSTÈME DE PRODUCTION DE CIMENT ENRICHI EN CARBONE À FAIBLE CONSOMMATION D'ÉNERGIE ET PROCÉDÉ DE PRODUCTION DE CLINKER DE CIMENT
一种低能耗碳富集水泥生产系统及生产水泥熟料的方法
PENG XUEPING (author) / CHEN CHANGHUA (author) / DAI ZHONGYUAN (author)
2022-06-23
Patent
Electronic Resource
Chinese
IPC:
C04B
Kalk
,
LIME
/
F27D
Einzelheiten oder Zubehör für Industrieöfen, Schachtöfen, Brennöfen oder Retorten, soweit sie nicht auf eine Ofenart eingeschränkt sind
,
DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
European Patent Office | 2024
|Low-energy-consumption carbon-enriched electric energy cement clinker firing system
European Patent Office | 2024
|European Patent Office | 2016
|European Patent Office | 2016
|CEMENT CLINKER, METHOD OF PRODUCING CEMENT CLINKER, AND CEMENT COMPOSITION
European Patent Office | 2023
|