A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION APPARATUS AND METHOD FOR HANGING, INTEGRALLY ASSEMBLING, AND INTEGRALLY LIFTING BUILDING VERTICAL FORMWORK
The present invention relates to a construction apparatus and method for hanging, integrally assembling, and integrally lifting a building vertical formwork. The construction apparatus is used for being mounted on a steel platform of a building machine, and comprises an I-shaped steel hanging head, I-shaped steel, a pulley hanging point, a turn buckle, a hanging rod, and a U-shaped clamping ring; the I-shaped steel is disposed at any position of the steel platform by means of the I-shaped steel hanging head; the pulley hanging point is provided on the I-shaped steel; the pulley hanging point is connected to the hanging rod by means of the turn buckle; the U-shaped clamping ring is provided at the tail end of the hanging rod; the U-shaped clamping ring is used for being connected to a vertical formwork. According to the present invention, binding and pouring of reinforcing bars of a vertical wall are performed firstly, the vertical wall formwork is lifted along with the steel platform after undergoing mold release, and then pouring of beam slabs is performed. A formwork hanging system is flexible in arrangement, is suitable for various structures and floor heights, and can enable the vertical formwork to undergo mold release and assembly and be lifted along with the steel platform. By using the construction apparatus and method in the present invention, the original processes of dispersedly disassembling, dispersedly assembling, and transferring the vertical formwork are omitted, and the effects of reducing the labor intensity of workers and shortening the construction period are achieved.
La présente invention concerne un appareil de construction et un procédé de suspension, d'assemblage d'un seul tenant et de levage en un seul bloc d'un coffrage vertical de bâtiment. L'appareil de construction est utilisé pour être monté sur une plate-forme en acier d'une machine de construction, et comprend une tête de suspension en acier en forme de I, de l'acier en forme de I, un point de suspension de poulie, un tendeur, une tige de suspension et une bague de serrage en forme de U ; l'acier en forme de I est disposé à n'importe quelle position de la plate-forme en acier au moyen de la tête de suspension en acier en forme de I ; le point de suspension de poulie est disposé sur l'acier en forme de I ; le point de suspension de poulie est relié à la tige de suspension au moyen du tendeur ; la bague de serrage en forme de U est disposée au niveau de l'extrémité arrière de la tige de suspension ; la bague de serrage en forme de U est utilisée pour être reliée à un coffrage vertical. Selon la présente invention, la liaison et le coulage de barres de renforcement d'une paroi verticale sont réalisés d'abord, le coffrage de paroi verticale est soulevé conjointement avec la plate-forme en acier après libération du moule, puis le coulage de dalles de poutre est réalisé. Un système de suspension de coffrage est flexible en agencement, est approprié pour diverses structures et hauteurs de plancher, et peut permettre au coffrage vertical de subir une libération et un assemblage de moule et d'être soulevé conjointement avec la plate-forme en acier. L'utilisation de l'appareil et du procédé de construction selon la présente invention, permet d'omettre les processus originaux de désassemblage dispersé, d'assemblage dispersé et de transfert du coffrage vertical, et d'obtenir des effets de réduction en mains-d'œuvre et en délai de construction.
本发明涉及一种建筑竖向模板悬挂整拼整提的施工设备及方法,其施工设备用于安装在造楼机的钢平台上,包括工字钢吊头、工字钢、滑轮吊点、花篮螺栓、吊杆和U形卡环,所述工字钢通过工字钢吊头布置于钢平台任意位置,所述滑轮吊点设置在工字钢上,所述滑轮吊点通过花篮螺栓与吊杆连接,所述U形卡环设置在吊杆的末端,所述U形卡环用于连接竖向模板。本发明先进行竖向墙体的钢筋绑扎与浇筑,竖向墙体模板退模后随钢平台提升,再进行梁板的浇筑。其中吊模板系统布置灵活,适用于各种结构与层高,可使竖向模板退合模并随钢平台提升。使用本发明施工设备及方法,省去了原有的竖向模板散拆散拼、倒运的过程,起到降低工人劳动强度,缩短工期的作用。
CONSTRUCTION APPARATUS AND METHOD FOR HANGING, INTEGRALLY ASSEMBLING, AND INTEGRALLY LIFTING BUILDING VERTICAL FORMWORK
The present invention relates to a construction apparatus and method for hanging, integrally assembling, and integrally lifting a building vertical formwork. The construction apparatus is used for being mounted on a steel platform of a building machine, and comprises an I-shaped steel hanging head, I-shaped steel, a pulley hanging point, a turn buckle, a hanging rod, and a U-shaped clamping ring; the I-shaped steel is disposed at any position of the steel platform by means of the I-shaped steel hanging head; the pulley hanging point is provided on the I-shaped steel; the pulley hanging point is connected to the hanging rod by means of the turn buckle; the U-shaped clamping ring is provided at the tail end of the hanging rod; the U-shaped clamping ring is used for being connected to a vertical formwork. According to the present invention, binding and pouring of reinforcing bars of a vertical wall are performed firstly, the vertical wall formwork is lifted along with the steel platform after undergoing mold release, and then pouring of beam slabs is performed. A formwork hanging system is flexible in arrangement, is suitable for various structures and floor heights, and can enable the vertical formwork to undergo mold release and assembly and be lifted along with the steel platform. By using the construction apparatus and method in the present invention, the original processes of dispersedly disassembling, dispersedly assembling, and transferring the vertical formwork are omitted, and the effects of reducing the labor intensity of workers and shortening the construction period are achieved.
La présente invention concerne un appareil de construction et un procédé de suspension, d'assemblage d'un seul tenant et de levage en un seul bloc d'un coffrage vertical de bâtiment. L'appareil de construction est utilisé pour être monté sur une plate-forme en acier d'une machine de construction, et comprend une tête de suspension en acier en forme de I, de l'acier en forme de I, un point de suspension de poulie, un tendeur, une tige de suspension et une bague de serrage en forme de U ; l'acier en forme de I est disposé à n'importe quelle position de la plate-forme en acier au moyen de la tête de suspension en acier en forme de I ; le point de suspension de poulie est disposé sur l'acier en forme de I ; le point de suspension de poulie est relié à la tige de suspension au moyen du tendeur ; la bague de serrage en forme de U est disposée au niveau de l'extrémité arrière de la tige de suspension ; la bague de serrage en forme de U est utilisée pour être reliée à un coffrage vertical. Selon la présente invention, la liaison et le coulage de barres de renforcement d'une paroi verticale sont réalisés d'abord, le coffrage de paroi verticale est soulevé conjointement avec la plate-forme en acier après libération du moule, puis le coulage de dalles de poutre est réalisé. Un système de suspension de coffrage est flexible en agencement, est approprié pour diverses structures et hauteurs de plancher, et peut permettre au coffrage vertical de subir une libération et un assemblage de moule et d'être soulevé conjointement avec la plate-forme en acier. L'utilisation de l'appareil et du procédé de construction selon la présente invention, permet d'omettre les processus originaux de désassemblage dispersé, d'assemblage dispersé et de transfert du coffrage vertical, et d'obtenir des effets de réduction en mains-d'œuvre et en délai de construction.
本发明涉及一种建筑竖向模板悬挂整拼整提的施工设备及方法,其施工设备用于安装在造楼机的钢平台上,包括工字钢吊头、工字钢、滑轮吊点、花篮螺栓、吊杆和U形卡环,所述工字钢通过工字钢吊头布置于钢平台任意位置,所述滑轮吊点设置在工字钢上,所述滑轮吊点通过花篮螺栓与吊杆连接,所述U形卡环设置在吊杆的末端,所述U形卡环用于连接竖向模板。本发明先进行竖向墙体的钢筋绑扎与浇筑,竖向墙体模板退模后随钢平台提升,再进行梁板的浇筑。其中吊模板系统布置灵活,适用于各种结构与层高,可使竖向模板退合模并随钢平台提升。使用本发明施工设备及方法,省去了原有的竖向模板散拆散拼、倒运的过程,起到降低工人劳动强度,缩短工期的作用。
CONSTRUCTION APPARATUS AND METHOD FOR HANGING, INTEGRALLY ASSEMBLING, AND INTEGRALLY LIFTING BUILDING VERTICAL FORMWORK
APPAREIL DE CONSTRUCTION ET PROCÉDÉ DE SUSPENSION, D'ASSEMBLAGE D'UN SEUL TENANT ET DE LEVAGE EN UN SEUL BLOC D'UN COFFRAGE VERTICAL DE BÂTIMENT
建筑竖向模板悬挂整拼整提的施工设备及方法
DING WEIXIANG (author) / QI CONGYUE (author) / QIAN SHIQING (author) / LIU HANWEN (author) / LIU HENG (author) / WANG WEI (author) / ZHANG ZHIHUA (author) / ZHOU HONGWEI (author) / LI MING (author) / ZHANG PENG (author)
2022-11-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method for integrally lifting formwork at expansion joint
European Patent Office | 2022
|Integrally tiled culvert construction formwork and mounting method
European Patent Office | 2023
|Integrally-cast steel frame-plastic building formwork system
European Patent Office | 2016
|Integrally-movable box culvert formwork and construction method thereof
European Patent Office | 2020
|