PRODUCTION CONSTRUCTION METHOD FOR BACKFILLING SUNKEN TOILET
A production construction method for backfilling a sunken toilet, comprises the following steps: 1) subpackaging foam materials; and (2) arranging a main sewer pipe, a primary drainage pipe and a secondary drainage pipe in a depression of a sunken toilet, the primary drainage pipe and the secondary drainage pipe separately communicating with the main sewer pipe, and a water inlet of the primary drainage pipe being a floor drain; providing the end of the main sewer pipe close to a bottom reinforced concrete floor slab with a hole; after the hole is plugged by a degradable plug, pouring standard or high-density foam concrete into the depression of the sunken toilet according to different room temperatures, and providing the surface of a foam concrete layer with trenches before the foam concrete is completely solidified, the trenches being a water inlet of the secondary drainage pipe; and, after the foam concrete is completely solidified, laying in the trenches gravel flush with the surface of the foam concrete layer, and then tiling the foam concrete layer. The method is easy to implement, less prone to water seepage and easy to maintain.
Un procédé de construction de production pour remblayer des toilettes encastrées comprend les étapes suivantes : 1) le sous-conditionnement de matériaux en mousse ; et 2) l'agencement d'un tuyau d'égout principal, d'un tuyau de drainage primaire et d'un tuyau de drainage secondaire dans une dépression de toilettes encastrées, le tuyau de drainage primaire et le tuyau de drainage secondaire communiquant séparément avec le tuyau d'égout principal, et une entrée d'eau du tuyau de drainage primaire étant un siphon de sol ; la fourniture d'un trou à l'extrémité du tuyau d'égout principal à proximité d'une dalle de plancher en béton armé inférieure ; après que le trou a été bouché par un bouchon dégradable, le coulage du béton cellulaire standard ou haute densité dans l'évidement des toilettes encastrées selon différentes températures ambiantes, et la fourniture de tranchées à la surface d'une couche de béton cellulaire avant que le béton cellulaire ne soit complètement solidifié, les tranchées étant une entrée d'eau du tuyau de drainage secondaire ; et, après la solidification complète du béton cellulaire, la pose dans les tranchées de gravier affleurant la surface de la couche de béton cellulaire, puis l'inclinaison de la couche de béton cellulaire. Le procédé est facile à mettre en œuvre, moins sujet à l'infiltration d'eau et facile à entretenir.
一种用于沉箱型卫生间回填的生产施工方法,包括以下步骤:1)发泡材料分装;2)在沉箱型卫生间的坑槽内设置主下水管、一次排水管和二次排水管,所述一次排水管和二次排水管分别与所述主下水管相连通,所述一次排水管的进水口为地漏;在主下水管靠近底层的钢筋给楼板的一端开设孔洞;将所述孔洞用可降解堵头堵住后,根据不同的室温,向沉箱型卫生间的坑槽内倒入标准版或者高密版的发泡水泥,并在发泡水泥完全凝固之前在发泡水泥层的表面开设沟槽,所述沟槽为所述二次排水管的进水口;发泡水泥完全凝固之后,在沟槽内铺设与发泡水泥层表面持平的砂砾,然后在其上铺设瓷砖。该方法施工简单,不易渗水,维修简单。
PRODUCTION CONSTRUCTION METHOD FOR BACKFILLING SUNKEN TOILET
A production construction method for backfilling a sunken toilet, comprises the following steps: 1) subpackaging foam materials; and (2) arranging a main sewer pipe, a primary drainage pipe and a secondary drainage pipe in a depression of a sunken toilet, the primary drainage pipe and the secondary drainage pipe separately communicating with the main sewer pipe, and a water inlet of the primary drainage pipe being a floor drain; providing the end of the main sewer pipe close to a bottom reinforced concrete floor slab with a hole; after the hole is plugged by a degradable plug, pouring standard or high-density foam concrete into the depression of the sunken toilet according to different room temperatures, and providing the surface of a foam concrete layer with trenches before the foam concrete is completely solidified, the trenches being a water inlet of the secondary drainage pipe; and, after the foam concrete is completely solidified, laying in the trenches gravel flush with the surface of the foam concrete layer, and then tiling the foam concrete layer. The method is easy to implement, less prone to water seepage and easy to maintain.
Un procédé de construction de production pour remblayer des toilettes encastrées comprend les étapes suivantes : 1) le sous-conditionnement de matériaux en mousse ; et 2) l'agencement d'un tuyau d'égout principal, d'un tuyau de drainage primaire et d'un tuyau de drainage secondaire dans une dépression de toilettes encastrées, le tuyau de drainage primaire et le tuyau de drainage secondaire communiquant séparément avec le tuyau d'égout principal, et une entrée d'eau du tuyau de drainage primaire étant un siphon de sol ; la fourniture d'un trou à l'extrémité du tuyau d'égout principal à proximité d'une dalle de plancher en béton armé inférieure ; après que le trou a été bouché par un bouchon dégradable, le coulage du béton cellulaire standard ou haute densité dans l'évidement des toilettes encastrées selon différentes températures ambiantes, et la fourniture de tranchées à la surface d'une couche de béton cellulaire avant que le béton cellulaire ne soit complètement solidifié, les tranchées étant une entrée d'eau du tuyau de drainage secondaire ; et, après la solidification complète du béton cellulaire, la pose dans les tranchées de gravier affleurant la surface de la couche de béton cellulaire, puis l'inclinaison de la couche de béton cellulaire. Le procédé est facile à mettre en œuvre, moins sujet à l'infiltration d'eau et facile à entretenir.
一种用于沉箱型卫生间回填的生产施工方法,包括以下步骤:1)发泡材料分装;2)在沉箱型卫生间的坑槽内设置主下水管、一次排水管和二次排水管,所述一次排水管和二次排水管分别与所述主下水管相连通,所述一次排水管的进水口为地漏;在主下水管靠近底层的钢筋给楼板的一端开设孔洞;将所述孔洞用可降解堵头堵住后,根据不同的室温,向沉箱型卫生间的坑槽内倒入标准版或者高密版的发泡水泥,并在发泡水泥完全凝固之前在发泡水泥层的表面开设沟槽,所述沟槽为所述二次排水管的进水口;发泡水泥完全凝固之后,在沟槽内铺设与发泡水泥层表面持平的砂砾,然后在其上铺设瓷砖。该方法施工简单,不易渗水,维修简单。
PRODUCTION CONSTRUCTION METHOD FOR BACKFILLING SUNKEN TOILET
PROCÉDÉ DE CONSTRUCTION DE PRODUCTION POUR LE REMBLAYAGE DE TOILETTES ENCASTRÉES
一种用于沉箱型卫生间回填的生产施工方法
SONG ZHENGGUO (author) / LI JIANGJUN (author) / CHEN ZISHI (author)
2023-10-19
Patent
Electronic Resource
Chinese
Light foam concrete for backfilling high-strength corrosion-resistant sunken toilet
European Patent Office | 2023
|Sunken toilet drainage structure and construction method thereof
European Patent Office | 2020
|Construction method for backfilling waterproofing of caisson toilet
European Patent Office | 2022
|