CONSTRUCTION METHOD FOR PREFABRICATED HOLLOW INTERNALLY-RAMMED CARRIER PILE
The present application relates to the technical field of civil engineering foundation piles, in particular to a construction method for a prefabricated hollow internally-rammed carrier pile, the method comprising the following steps: mounting a bottom sealing steel plate at a lower end of a hollow pile body to seal the bottom of the hollow pile body; and slowly humping a slender heavy hammer into an inner cavity of a sealed isolation cavity through a pile opening at an upper end of the hollow pile body, wherein a filler and airflow channel is provided between the slender heavy hammer and a side wall of the sealed isolation cavity, such that cement sand mixture is tamped with low tamping energy, and whether the bottom sealing steel plate is opened or not is determined. When the cement sand mixture reaches a preset height in the sealed isolation cavity or the filled amount of the cement sand mixture reaches a preset value, the cement sand mixture is continuously filled through the channel, the tamping energy is properly increased, the cement sand mixture and the soil body below the pile end within a certain depth and range are driven to be reinforced and compacted to form a pile end carrier. According to the present application, the influences of underground water on engineering foundation pile construction can be overcome, and the yield in an actual foundation pile construction process is improved.
La présente invention se rapporte au domaine technique des pieux de fondation d'ingénierie civile, en particulier à un procédé de construction d'un pieu de support creux à compactage interne préfabriqué, le procédé comprenant les étapes suivantes consistant : à monter une plaque d'acier d'étanchéité inférieure au niveau d'une extrémité inférieure d'un corps de pieu creux pour étanchéifier le fond du corps de pieu creux ; et à bourrer lentement un marteau lourd mince dans une cavité interne d'une cavité d'isolation étanche à travers une ouverture de pieu au niveau d'une extrémité supérieure du corps de pieu creux, une charge de remplissage et un canal d'écoulement d'air étant disposés entre le marteau lourd mince et une paroi latérale de la cavité d'isolation étanche, de telle sorte que le mélange ciment-sable est tassé avec une faible énergie de tassement, et il est déterminé si la plaque d'acier d'étanchéité inférieure est ouverte ou non. Lorsque le mélange ciment-sable atteint une hauteur prédéfinie dans la cavité d'isolation étanche ou que la quantité remplie du mélange ciment-sable atteint une valeur prédéfinie, le mélange ciment-sable est rempli en continu à travers le canal, l'énergie de tassement est correctement augmentée, le mélange ciment-sable et le corps de sol sous l'extrémité de pieu jusqu'à une certaine profondeur et distance sont amenés à être renforcés et compactés pour former un support d'extrémité de pieu. Selon la présente demande, les influences de l'eau souterraine sur la construction de pieu de fondation d'ingénierie peuvent être surmontées, et le rendement dans un processus de construction de pieu de fondation réel est amélioré.
本申请涉及一种预制空心内夯载体桩的施工方法,涉及土建基桩技术领域,其包括以下步骤:在空心桩体下端安装封底钢板以对空心桩体进行封底处理,将细长重锤沿空心桩体上端桩口处缓慢溜放至密封隔绝腔内腔中,且细长重锤与密封隔绝腔侧壁留有填料与气流通道,以较低夯击能量对水泥砂拌合物进行夯击并判断是否已打开封底钢板。当水泥砂拌合物在密封隔绝腔中达到预设高度或者水泥砂拌合物填入量达到预设值之后,继续利用通道填入水泥沙拌合物,适度加大夯击能量,驱使水泥沙拌合物和桩端下一定深度和范围内的土体被加固密实,形成桩端载体。本申请能够克服地下水对工程基桩施工的影响,提高实际基桩施工过程中的成品率。
CONSTRUCTION METHOD FOR PREFABRICATED HOLLOW INTERNALLY-RAMMED CARRIER PILE
The present application relates to the technical field of civil engineering foundation piles, in particular to a construction method for a prefabricated hollow internally-rammed carrier pile, the method comprising the following steps: mounting a bottom sealing steel plate at a lower end of a hollow pile body to seal the bottom of the hollow pile body; and slowly humping a slender heavy hammer into an inner cavity of a sealed isolation cavity through a pile opening at an upper end of the hollow pile body, wherein a filler and airflow channel is provided between the slender heavy hammer and a side wall of the sealed isolation cavity, such that cement sand mixture is tamped with low tamping energy, and whether the bottom sealing steel plate is opened or not is determined. When the cement sand mixture reaches a preset height in the sealed isolation cavity or the filled amount of the cement sand mixture reaches a preset value, the cement sand mixture is continuously filled through the channel, the tamping energy is properly increased, the cement sand mixture and the soil body below the pile end within a certain depth and range are driven to be reinforced and compacted to form a pile end carrier. According to the present application, the influences of underground water on engineering foundation pile construction can be overcome, and the yield in an actual foundation pile construction process is improved.
La présente invention se rapporte au domaine technique des pieux de fondation d'ingénierie civile, en particulier à un procédé de construction d'un pieu de support creux à compactage interne préfabriqué, le procédé comprenant les étapes suivantes consistant : à monter une plaque d'acier d'étanchéité inférieure au niveau d'une extrémité inférieure d'un corps de pieu creux pour étanchéifier le fond du corps de pieu creux ; et à bourrer lentement un marteau lourd mince dans une cavité interne d'une cavité d'isolation étanche à travers une ouverture de pieu au niveau d'une extrémité supérieure du corps de pieu creux, une charge de remplissage et un canal d'écoulement d'air étant disposés entre le marteau lourd mince et une paroi latérale de la cavité d'isolation étanche, de telle sorte que le mélange ciment-sable est tassé avec une faible énergie de tassement, et il est déterminé si la plaque d'acier d'étanchéité inférieure est ouverte ou non. Lorsque le mélange ciment-sable atteint une hauteur prédéfinie dans la cavité d'isolation étanche ou que la quantité remplie du mélange ciment-sable atteint une valeur prédéfinie, le mélange ciment-sable est rempli en continu à travers le canal, l'énergie de tassement est correctement augmentée, le mélange ciment-sable et le corps de sol sous l'extrémité de pieu jusqu'à une certaine profondeur et distance sont amenés à être renforcés et compactés pour former un support d'extrémité de pieu. Selon la présente demande, les influences de l'eau souterraine sur la construction de pieu de fondation d'ingénierie peuvent être surmontées, et le rendement dans un processus de construction de pieu de fondation réel est amélioré.
本申请涉及一种预制空心内夯载体桩的施工方法,涉及土建基桩技术领域,其包括以下步骤:在空心桩体下端安装封底钢板以对空心桩体进行封底处理,将细长重锤沿空心桩体上端桩口处缓慢溜放至密封隔绝腔内腔中,且细长重锤与密封隔绝腔侧壁留有填料与气流通道,以较低夯击能量对水泥砂拌合物进行夯击并判断是否已打开封底钢板。当水泥砂拌合物在密封隔绝腔中达到预设高度或者水泥砂拌合物填入量达到预设值之后,继续利用通道填入水泥沙拌合物,适度加大夯击能量,驱使水泥沙拌合物和桩端下一定深度和范围内的土体被加固密实,形成桩端载体。本申请能够克服地下水对工程基桩施工的影响,提高实际基桩施工过程中的成品率。
CONSTRUCTION METHOD FOR PREFABRICATED HOLLOW INTERNALLY-RAMMED CARRIER PILE
PROCÉDÉ DE CONSTRUCTION DE PIEU DE SUPPORT CREUX À COMPACTAGE INTERNE PRÉFABRIQUÉ
一种预制空心内夯载体桩的施工方法
WANG JIZHONG (author) / ZHANG LITING (author) / ZHANG LIANXI (author) / XU TONG (author) / ZHANG SHAOXIONG (author) / WANG GUANGLIANG (author) / YANG QIAN (author) / LI XIANGMING (author)
2024-04-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|European Patent Office | 2023
|Construction method of prefabricated pile body of carrier pile
European Patent Office | 2021
|