CONSTRUCTION METHOD AND DESIGN METHOD FOR POURING OF STEEL-SHELLED CONCRETE IMMERSED TUBE
The present invention relates to a steel-shelled concrete immersed tube, and in particular to a construction method and design method for the pouring of a steel-shelled concrete immersed tube. The construction method comprises: step S1, dividing a roof (4) into 2N+1 roof pouring regions; step S2, carrying out pouring in the 2nd, (N+2)nd and 2Nth roof pouring regions; step S3, carrying out pouring in the 3rd, (N+1)th and (2N-1)th roof pouring regions; step S4, carrying out pouring in other roof pouring regions except the 1st and (N+1)th roof pouring regions according to a pouring rule; step S5, carrying out pouring in the 1st and (N+1)th roof pouring regions; and step S6, repeating steps S2-S5 until the pouring in all the top plate pouring regions is completed. The construction method for the pouring of a steel-shelled concrete immersed tube according to the present application can effectively reduce the number of times of washing and starting a pouring machine and the concrete loss while realizing the aims of finally pouring concrete into end portions of tube sections and facilitating the control over the final precision of steel shells at the end portions.
La présente invention concerne un tube immergé en béton à coque en acier, et en particulier un procédé de construction et un procédé de conception pour le coulage d'un tube immergé en béton à coque en acier. Le procédé de construction comprend les étapes suivantes : étape S1, qui consiste à diviser un toit (4) en 2N+1 régions de coulage de toit ; étape S2, qui consiste à réaliser un coulage dans les 2ème, (N+2)ième et (2N)ième régions de coulage de toit ; étape S3, qui consiste à réaliser un coulage dans les 3ème, (N+1)ième et (2N-1)ième régions de coulage de toit ; étape S4, qui consiste à réaliser un coulage dans d'autres régions de coulage de toit à l'exception des première et (N+1)ième régions de coulage de toit selon une règle de coulage ; étape S5, qui consiste à réaliser un coulage dans les première et (N+1)ième régions de coulage de toit ; et étape S6, qui consiste à répéter les étapes S2 à S5 jusqu'à ce que le coulage dans toutes les régions de coulage de plaque supérieure soit achevé. Le procédé de construction pour le coulage d'un tube immergé en béton à coque en acier selon la présente demande peut réduire de manière efficace le nombre de lavages et démarrages d'une machine de coulage et la perte de béton tout en réalisant les objectifs de coulage final de béton dans des parties d'extrémité de sections de tube et de facilitation de la commande sur la précision finale de coques en acier au niveau des parties d'extrémité.
本发明涉及一种钢壳混凝土沉管,特别是一种用于钢壳混凝土沉管浇筑的施工方法及设计方法,其中施工方法包含:S1:将顶板(4)划分2N+1个顶板浇筑区域;S2:浇筑第2个、第N+2个和第2N个顶板浇筑区域;S3:浇筑第3个、第N+1个和第2N-1个顶板浇筑区域;S4:之后沿浇筑规律浇筑除第1个和第N+1个顶板浇筑区域以外其余顶板浇筑区域;S5:浇筑第1个和第N+1个顶板浇筑区域;S6:重复步骤S2-S5,浇筑完成所有顶板浇筑区域。本申请所述的一种用于钢壳混凝土沉管浇筑的施工方法,不仅达到最后浇筑管节的端部,利于端钢壳最终精度的控制的目的,而且有效地减少浇注机洗机开机次数,有效地降低混凝土损耗。
CONSTRUCTION METHOD AND DESIGN METHOD FOR POURING OF STEEL-SHELLED CONCRETE IMMERSED TUBE
The present invention relates to a steel-shelled concrete immersed tube, and in particular to a construction method and design method for the pouring of a steel-shelled concrete immersed tube. The construction method comprises: step S1, dividing a roof (4) into 2N+1 roof pouring regions; step S2, carrying out pouring in the 2nd, (N+2)nd and 2Nth roof pouring regions; step S3, carrying out pouring in the 3rd, (N+1)th and (2N-1)th roof pouring regions; step S4, carrying out pouring in other roof pouring regions except the 1st and (N+1)th roof pouring regions according to a pouring rule; step S5, carrying out pouring in the 1st and (N+1)th roof pouring regions; and step S6, repeating steps S2-S5 until the pouring in all the top plate pouring regions is completed. The construction method for the pouring of a steel-shelled concrete immersed tube according to the present application can effectively reduce the number of times of washing and starting a pouring machine and the concrete loss while realizing the aims of finally pouring concrete into end portions of tube sections and facilitating the control over the final precision of steel shells at the end portions.
La présente invention concerne un tube immergé en béton à coque en acier, et en particulier un procédé de construction et un procédé de conception pour le coulage d'un tube immergé en béton à coque en acier. Le procédé de construction comprend les étapes suivantes : étape S1, qui consiste à diviser un toit (4) en 2N+1 régions de coulage de toit ; étape S2, qui consiste à réaliser un coulage dans les 2ème, (N+2)ième et (2N)ième régions de coulage de toit ; étape S3, qui consiste à réaliser un coulage dans les 3ème, (N+1)ième et (2N-1)ième régions de coulage de toit ; étape S4, qui consiste à réaliser un coulage dans d'autres régions de coulage de toit à l'exception des première et (N+1)ième régions de coulage de toit selon une règle de coulage ; étape S5, qui consiste à réaliser un coulage dans les première et (N+1)ième régions de coulage de toit ; et étape S6, qui consiste à répéter les étapes S2 à S5 jusqu'à ce que le coulage dans toutes les régions de coulage de plaque supérieure soit achevé. Le procédé de construction pour le coulage d'un tube immergé en béton à coque en acier selon la présente demande peut réduire de manière efficace le nombre de lavages et démarrages d'une machine de coulage et la perte de béton tout en réalisant les objectifs de coulage final de béton dans des parties d'extrémité de sections de tube et de facilitation de la commande sur la précision finale de coques en acier au niveau des parties d'extrémité.
本发明涉及一种钢壳混凝土沉管,特别是一种用于钢壳混凝土沉管浇筑的施工方法及设计方法,其中施工方法包含:S1:将顶板(4)划分2N+1个顶板浇筑区域;S2:浇筑第2个、第N+2个和第2N个顶板浇筑区域;S3:浇筑第3个、第N+1个和第2N-1个顶板浇筑区域;S4:之后沿浇筑规律浇筑除第1个和第N+1个顶板浇筑区域以外其余顶板浇筑区域;S5:浇筑第1个和第N+1个顶板浇筑区域;S6:重复步骤S2-S5,浇筑完成所有顶板浇筑区域。本申请所述的一种用于钢壳混凝土沉管浇筑的施工方法,不仅达到最后浇筑管节的端部,利于端钢壳最终精度的控制的目的,而且有效地减少浇注机洗机开机次数,有效地降低混凝土损耗。
CONSTRUCTION METHOD AND DESIGN METHOD FOR POURING OF STEEL-SHELLED CONCRETE IMMERSED TUBE
PROCÉDÉ DE CONSTRUCTION ET PROCÉDÉ DE CONCEPTION POUR LE COULAGE D'UN TUBE IMMERGÉ EN BÉTON À COQUE EN ACIER
一种用于钢壳混凝土沉管浇筑的施工方法及设计方法
ZHANG WENSEN (author) / WANG XIAODONG (author) / YANG YANG (author) / DENG MAOXIN (author) / WU YUHENG (author) / AN LINGZHI (author) / LIN WEICAI (author) / DENG JUN (author) / DENG SHIMIN (author) / XUE LIYUAN (author)
2024-05-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Semi-floating state pouring method for steel shell concrete immersed tube
European Patent Office | 2021
|All-land pouring process for steel shell concrete immersed tube
European Patent Office | 2023
|Floating state pouring method for steel shell immersed tube
European Patent Office | 2021
|Self-compacting concrete pouring method for bottom plate of steel shell immersed tube tunnel
European Patent Office | 2022
|Immersed tube cast-in-place underwater final joint concrete pouring method
European Patent Office | 2024
|