GRID-SHAPED DIAPHRAGM WALL CONSTRUCTION METHOD USING PILE-TYPE NODES
The present invention relates to a grid-shaped diaphragm wall construction method using pile-type nodes. The method comprises: constructing, at each node position of a diaphragm wall, a cast-in-place bored pile to serve as a diaphragm wall node, wherein the pile diameter of the cast-in-place bored pile is greater than the thickness of the diaphragm wall, and the bottom elevation of the pile is located below the bottom elevation of the diaphragm wall by a certain depth; constructing a diaphragm wall trench segment between every two piles, and when the diaphragm wall trench segment is being milled, milling joint notches at side walls of notch segments of the piles; and then lowering trench segment reinforcement cages, pouring concrete, and connecting all the nodes to form a grid-shaped diaphragm wall structure. By means of the present invention, there is no need to excavate trench holes during construction of diaphragm wall nodes, such that the risk of hole collapse and the problem of concrete flowing around that are present in traditional process construction are fundamentally avoided. In addition, the nodes themselves have high rigidity and a good impermeability effect, the construction speed is high, and the cost is low.
La présente invention concerne un procédé de construction de paroi de diaphragme en forme de grille utilisant des nœuds de type pieu. Le procédé comprend : la construction, à chaque position de nœud d'une paroi de diaphragme, d'un pieu foré coulé sur place pour servir de nœud de paroi de diaphragme, le diamètre de pieu du pieu foré coulé sur place étant supérieur à l'épaisseur de la paroi de diaphragme, et l'élévation inférieure du pieu étant située au-dessous de l'élévation inférieure de la paroi de diaphragme d'une certaine profondeur ; la construction d'un segment de tranchée de paroi de diaphragme entre chaque paire de pieux, et la réalisation, lorsque le segment de tranchée de paroi de diaphragme est broyé, d'encoches de joint au niveau de parois latérales de segments d'encoche des pieux ; puis l'abaissement des cages d'armature de segment de tranchée, le coulage de béton, et le raccordement de tous les nœuds pour former une structure de paroi de diaphragme en forme de grille. Au moyen de la présente invention, il n'est pas nécessaire d'excaver des trous de tranchée pendant la construction des nœuds de paroi de diaphragme, de telle sorte que le risque d'affaissement de trou et le problème de fluage de béton autour de celui-ci qui sont présents dans la construction par des procédés classiques sont fondamentalement évités. De plus, les nœuds eux-mêmes ont une rigidité élevée et un bon effet d'imperméabilité, la vitesse de construction est élevée, et le coût est faible.
本发明涉及一种采用桩柱式节点的网格状地下连续墙施工方法,在地连墙每个节点位置施工钻孔灌注桩作为地连墙节点,钻孔灌注桩的桩柱直径大于地连墙的厚度,桩柱底部标高位于地连墙底部标高以下一定深度,在每两个桩柱间施工地连墙槽段,地连墙槽段铣槽时,一并在桩柱槽口段侧壁上铣削出接头槽口,然后下放槽段钢筋笼、浇筑混凝土,连接各节点,形成网格状地连墙结构。本发明在地连墙节点施工时不需要开挖槽孔,从根本上避免了传统工艺施工时存在的塌孔风险以及混凝土绕流问题,且节点本身刚度大,抗渗效果好,施工速度快,成本低。
GRID-SHAPED DIAPHRAGM WALL CONSTRUCTION METHOD USING PILE-TYPE NODES
The present invention relates to a grid-shaped diaphragm wall construction method using pile-type nodes. The method comprises: constructing, at each node position of a diaphragm wall, a cast-in-place bored pile to serve as a diaphragm wall node, wherein the pile diameter of the cast-in-place bored pile is greater than the thickness of the diaphragm wall, and the bottom elevation of the pile is located below the bottom elevation of the diaphragm wall by a certain depth; constructing a diaphragm wall trench segment between every two piles, and when the diaphragm wall trench segment is being milled, milling joint notches at side walls of notch segments of the piles; and then lowering trench segment reinforcement cages, pouring concrete, and connecting all the nodes to form a grid-shaped diaphragm wall structure. By means of the present invention, there is no need to excavate trench holes during construction of diaphragm wall nodes, such that the risk of hole collapse and the problem of concrete flowing around that are present in traditional process construction are fundamentally avoided. In addition, the nodes themselves have high rigidity and a good impermeability effect, the construction speed is high, and the cost is low.
La présente invention concerne un procédé de construction de paroi de diaphragme en forme de grille utilisant des nœuds de type pieu. Le procédé comprend : la construction, à chaque position de nœud d'une paroi de diaphragme, d'un pieu foré coulé sur place pour servir de nœud de paroi de diaphragme, le diamètre de pieu du pieu foré coulé sur place étant supérieur à l'épaisseur de la paroi de diaphragme, et l'élévation inférieure du pieu étant située au-dessous de l'élévation inférieure de la paroi de diaphragme d'une certaine profondeur ; la construction d'un segment de tranchée de paroi de diaphragme entre chaque paire de pieux, et la réalisation, lorsque le segment de tranchée de paroi de diaphragme est broyé, d'encoches de joint au niveau de parois latérales de segments d'encoche des pieux ; puis l'abaissement des cages d'armature de segment de tranchée, le coulage de béton, et le raccordement de tous les nœuds pour former une structure de paroi de diaphragme en forme de grille. Au moyen de la présente invention, il n'est pas nécessaire d'excaver des trous de tranchée pendant la construction des nœuds de paroi de diaphragme, de telle sorte que le risque d'affaissement de trou et le problème de fluage de béton autour de celui-ci qui sont présents dans la construction par des procédés classiques sont fondamentalement évités. De plus, les nœuds eux-mêmes ont une rigidité élevée et un bon effet d'imperméabilité, la vitesse de construction est élevée, et le coût est faible.
本发明涉及一种采用桩柱式节点的网格状地下连续墙施工方法,在地连墙每个节点位置施工钻孔灌注桩作为地连墙节点,钻孔灌注桩的桩柱直径大于地连墙的厚度,桩柱底部标高位于地连墙底部标高以下一定深度,在每两个桩柱间施工地连墙槽段,地连墙槽段铣槽时,一并在桩柱槽口段侧壁上铣削出接头槽口,然后下放槽段钢筋笼、浇筑混凝土,连接各节点,形成网格状地连墙结构。本发明在地连墙节点施工时不需要开挖槽孔,从根本上避免了传统工艺施工时存在的塌孔风险以及混凝土绕流问题,且节点本身刚度大,抗渗效果好,施工速度快,成本低。
GRID-SHAPED DIAPHRAGM WALL CONSTRUCTION METHOD USING PILE-TYPE NODES
PROCÉDÉ DE CONSTRUCTION DE PAROI DE DIAPHRAGME EN FORME DE GRILLE UTILISANT DES NŒUDS DE TYPE PIEU
一种采用桩柱式节点的网格状地下连续墙施工方法
LU GUANNAN (author) / SONG BING (author) / XIAO XIANGRONG (author) / ZHU XIAOLIANG (author) / NAN JINJIANG (author) / HE SIYUAN (author)
2024-07-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of latticed underground diaphragm wall adopting pile type nodes
European Patent Office | 2023
|Construction method for connector pile type prefabricated underground diaphragm wall connection
European Patent Office | 2024
|Stirring pile diaphragm wall structure and construction method thereof
European Patent Office | 2023
|European Patent Office | 2021
|Box-shaped pile and diaphragm wall foundations for high loads
British Library Conference Proceedings | 2001
|