METHOD FOR ERECTING CURVED STEEL TRUSS CABLE-STAYED BRIDGE
The present invention provides a method for erecting a curved steel truss cable-stayed bridge, and relates to the technical field of erecting bridges. The method for erecting a curved steel truss cable-stayed bridge comprises: installing two tower cranes, and using the two tower cranes to install a swivel system; using the two tower cranes to symmetrically and synchronously hoist a pier-top steel beam onto a suspension support; using the two tower cranes to symmetrically and synchronously hoist a preset number of steel beam sections along two sides of the pier-top steel beam, and synchronously install a preset number of steel tower sections above the pier-top steel beam; using the two tower cranes to install two bridge deck cranes; using the two bridge deck cranes to symmetrically and synchronously hoist the remaining steel beam sections, and synchronously installing the remaining number of steel tower sections above the pier-top steel beam, with each hoisted steel beam section being accompanied by the hanging of a stay cable at a corresponding position, and performing tensioning. Compared with the prior art, the present invention achieves synchronous construction of towers and beams, thereby fully utilizing bridge construction equipment, and improving the efficiency of erecting steel truss cable-stayed bridges.
La présente invention concerne un procédé de montage d'un pont haubané en treillis d'acier incurvé, et se rapporte au domaine technique du montage de ponts. Le procédé de montage d'un pont haubané en treillis d'acier incurvé consiste à : installer deux grues à tour, et utiliser les deux grues à tour pour installer un système pivotant ; utiliser les deux grues à tour pour lever symétriquement et de manière synchrone une poutre d'acier de sommet de pilier sur un support de suspension ; utiliser les deux grues à tour pour lever symétriquement et de manière synchrone un nombre prédéfini de sections de poutre d'acier le long de deux côtés de la poutre d'acier de sommet de pilier, et installer de manière synchrone un nombre prédéfini de sections de tour d'acier au-dessus de la poutre d'acier de sommet de pilier ; utiliser les deux grues à tour pour installer deux grues de tablier de pont ; utiliser les deux grues de tablier de pont pour lever symétriquement et de manière synchrone les sections de poutre d'acier restantes, et installer de manière synchrone le nombre restant de sections de tour d'acier au-dessus de la poutre d'acier de sommet de pilier, chaque section de poutre d'acier levée étant accompagnée de la suspension d'un câble de haubanage à une position correspondante, et effectuer une mise sous tension. Par rapport à l'état de la technique, la présente invention permet d'obtenir une construction synchrone de tours et de poutres, ce qui permet d'utiliser pleinement un équipement de construction de pont, et d'améliorer l'efficacité de montage de ponts haubanés en treillis d'acier.
本发明提供了一种曲线钢桁斜拉桥的架设方法,涉及桥梁架设技术领域,曲线钢桁斜拉桥的架设方法包括安装两台塔吊,并且通过两台塔吊安装转体系统;通过两台塔吊在悬拼支架上对称同步吊装墩顶钢梁;通过两台塔吊沿墩顶钢梁两侧对称同步吊装预设数量的钢梁节段,并且在墩顶钢梁上方同步安装预设数量的钢塔节段;通过两台塔吊安装两台桥面吊机;通过两台桥面吊机对称同步吊装剩余钢梁节段,并且在墩顶钢梁上方同步安装剩余数量的钢塔节段,每吊装一个钢梁节段挂设相应位置的斜拉索并进行张拉。本发明相比于现有技术,可以塔梁同步施工,且架桥设备得到充分利用,提高了钢桁斜拉桥的架设效率。
METHOD FOR ERECTING CURVED STEEL TRUSS CABLE-STAYED BRIDGE
The present invention provides a method for erecting a curved steel truss cable-stayed bridge, and relates to the technical field of erecting bridges. The method for erecting a curved steel truss cable-stayed bridge comprises: installing two tower cranes, and using the two tower cranes to install a swivel system; using the two tower cranes to symmetrically and synchronously hoist a pier-top steel beam onto a suspension support; using the two tower cranes to symmetrically and synchronously hoist a preset number of steel beam sections along two sides of the pier-top steel beam, and synchronously install a preset number of steel tower sections above the pier-top steel beam; using the two tower cranes to install two bridge deck cranes; using the two bridge deck cranes to symmetrically and synchronously hoist the remaining steel beam sections, and synchronously installing the remaining number of steel tower sections above the pier-top steel beam, with each hoisted steel beam section being accompanied by the hanging of a stay cable at a corresponding position, and performing tensioning. Compared with the prior art, the present invention achieves synchronous construction of towers and beams, thereby fully utilizing bridge construction equipment, and improving the efficiency of erecting steel truss cable-stayed bridges.
La présente invention concerne un procédé de montage d'un pont haubané en treillis d'acier incurvé, et se rapporte au domaine technique du montage de ponts. Le procédé de montage d'un pont haubané en treillis d'acier incurvé consiste à : installer deux grues à tour, et utiliser les deux grues à tour pour installer un système pivotant ; utiliser les deux grues à tour pour lever symétriquement et de manière synchrone une poutre d'acier de sommet de pilier sur un support de suspension ; utiliser les deux grues à tour pour lever symétriquement et de manière synchrone un nombre prédéfini de sections de poutre d'acier le long de deux côtés de la poutre d'acier de sommet de pilier, et installer de manière synchrone un nombre prédéfini de sections de tour d'acier au-dessus de la poutre d'acier de sommet de pilier ; utiliser les deux grues à tour pour installer deux grues de tablier de pont ; utiliser les deux grues de tablier de pont pour lever symétriquement et de manière synchrone les sections de poutre d'acier restantes, et installer de manière synchrone le nombre restant de sections de tour d'acier au-dessus de la poutre d'acier de sommet de pilier, chaque section de poutre d'acier levée étant accompagnée de la suspension d'un câble de haubanage à une position correspondante, et effectuer une mise sous tension. Par rapport à l'état de la technique, la présente invention permet d'obtenir une construction synchrone de tours et de poutres, ce qui permet d'utiliser pleinement un équipement de construction de pont, et d'améliorer l'efficacité de montage de ponts haubanés en treillis d'acier.
本发明提供了一种曲线钢桁斜拉桥的架设方法,涉及桥梁架设技术领域,曲线钢桁斜拉桥的架设方法包括安装两台塔吊,并且通过两台塔吊安装转体系统;通过两台塔吊在悬拼支架上对称同步吊装墩顶钢梁;通过两台塔吊沿墩顶钢梁两侧对称同步吊装预设数量的钢梁节段,并且在墩顶钢梁上方同步安装预设数量的钢塔节段;通过两台塔吊安装两台桥面吊机;通过两台桥面吊机对称同步吊装剩余钢梁节段,并且在墩顶钢梁上方同步安装剩余数量的钢塔节段,每吊装一个钢梁节段挂设相应位置的斜拉索并进行张拉。本发明相比于现有技术,可以塔梁同步施工,且架桥设备得到充分利用,提高了钢桁斜拉桥的架设效率。
METHOD FOR ERECTING CURVED STEEL TRUSS CABLE-STAYED BRIDGE
PROCÉDÉ DE MONTAGE D'UN PONT HAUBANÉ EN TREILLIS D'ACIER INCURVÉ
一种曲线钢桁斜拉桥的架设方法
LIANG HUI (author) / HUANG XINGYU (author) / LI TONG (author) / ZHU DONGMING (author) / YU WEIJIE (author) / LONG YUYI (author) / ZHANG YANHUI (author) / XIA CHAOJUAN (author) / LI FENG (author) / SU YAN (author)
2024-07-18
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Method for erecting curved steel truss cable-stayed bridge
European Patent Office | 2023
|Method for erecting cable-stayed bridge steel truss girder through asymmetric bracket
European Patent Office | 2022
|Erecting method of cable-stayed bridge main beam and cable-stayed bridge main beam
European Patent Office | 2020
|