A platform for research: civil engineering, architecture and urbanism
INTEGRATED INTELLIGENT TOWER BUILDING APPARATUS FOR INDUSTRIAL CONSTRUCTION OF BRIDGE TOWER AND METHOD
Disclosed in the present invention are an integrated intelligent tower building apparatus for industrial construction of a bridge tower and a method. The integrated intelligent tower building apparatus comprises: a frame body, an automatic climbing mechanism, a template system, a vibrating system, a material spreading system, an opening/closing mechanism, a maintenance system, and an automatic template cleaning robot. The opening/closing mechanism comprises a tripod, an opening/closing oil cylinder, a pulling plate, and an opening/closing beam. The tripod is welded under a runway beam of an outer mold support. One end of the opening/closing oil cylinder is hinged to and fixed to a vertical rod of the tripod, and the other end of the opening/closing oil cylinder is hinged to the opening/closing beam. The opening/closing beam is hinged to a back arris of an outer template, and the other end of the opening/closing beam is hinged to the lower end of the vertical rod of the tripod. One end of the pulling plate is hinged to the side surface of the runway beam, and the other end of the pulling plate is hinged to a platform beam on the back of the template. The present invention achieves the improvement of the automation and intelligence level of the apparatus in each process of main tower construction.
La présente invention concerne un appareil de construction de tour intelligente intégrée pour la construction industrielle d'une tour de pont et un procédé. L'appareil de construction de tour intelligente intégrée comprend : un corps de cadre, un mécanisme d'escalade automatique, un système de gabarit, un système vibrant, un système d'étalement de matériau, un mécanisme d'ouverture/fermeture, un système de maintenance et un robot de nettoyage de gabarit automatique. Le mécanisme d'ouverture/fermeture comprend un trépied, un vérin à l'huile d'ouverture/fermeture, une plaque de traction et une barre d'ouverture/fermeture. Le trépied est soudé sous une poutre de piste d'un support de moule externe. Une extrémité du vérin à l'huile d'ouverture/fermeture est articulée sur une tige verticale du trépied et fixée à celle-ci, et l'autre extrémité du vérin à l'huile d'ouverture/fermeture est articulée sur la barre d'ouverture/fermeture. La barre d'ouverture/fermeture est articulée sur une arête arrière d'un gabarit externe, et l'autre extrémité de la barre d'ouverture/fermeture est articulée sur l'extrémité inférieure de la tige verticale du trépied. Une extrémité de la plaque de traction est articulée sur la surface latérale de la poutre de piste, et l'autre extrémité de la plaque de traction est articulée sur une poutre de plateforme sur l'arrière du gabarit. La présente invention permet d'améliorer le niveau d'automatisation et d'intelligence de l'appareil dans chaque procédé de construction de tour principale.
本发明公开了一种用于桥塔工业化建造的一体化智能筑塔装置及方法,包括:架体、自动爬升机构、模板系统、振捣系统、布料系统、开合机构、养护系统及模板自动清理机器人组成;所述开合机构包括:三角架、开合油缸、拉板及开合梁;所述三角架焊接于外模支架的走道梁下方,开合油缸一端铰接固定在三角架竖杆上,开合油缸另一端铰接在开合梁上,开合梁与外模板背楞铰接,开合梁另一端与三角架竖杆的下端铰接,拉板的一端与走道梁的侧面铰接,拉板的另一端铰接于模板背部平台梁上。本发明实现了装备在主塔施工各工序的自动化、智能化水平的提高。
INTEGRATED INTELLIGENT TOWER BUILDING APPARATUS FOR INDUSTRIAL CONSTRUCTION OF BRIDGE TOWER AND METHOD
Disclosed in the present invention are an integrated intelligent tower building apparatus for industrial construction of a bridge tower and a method. The integrated intelligent tower building apparatus comprises: a frame body, an automatic climbing mechanism, a template system, a vibrating system, a material spreading system, an opening/closing mechanism, a maintenance system, and an automatic template cleaning robot. The opening/closing mechanism comprises a tripod, an opening/closing oil cylinder, a pulling plate, and an opening/closing beam. The tripod is welded under a runway beam of an outer mold support. One end of the opening/closing oil cylinder is hinged to and fixed to a vertical rod of the tripod, and the other end of the opening/closing oil cylinder is hinged to the opening/closing beam. The opening/closing beam is hinged to a back arris of an outer template, and the other end of the opening/closing beam is hinged to the lower end of the vertical rod of the tripod. One end of the pulling plate is hinged to the side surface of the runway beam, and the other end of the pulling plate is hinged to a platform beam on the back of the template. The present invention achieves the improvement of the automation and intelligence level of the apparatus in each process of main tower construction.
La présente invention concerne un appareil de construction de tour intelligente intégrée pour la construction industrielle d'une tour de pont et un procédé. L'appareil de construction de tour intelligente intégrée comprend : un corps de cadre, un mécanisme d'escalade automatique, un système de gabarit, un système vibrant, un système d'étalement de matériau, un mécanisme d'ouverture/fermeture, un système de maintenance et un robot de nettoyage de gabarit automatique. Le mécanisme d'ouverture/fermeture comprend un trépied, un vérin à l'huile d'ouverture/fermeture, une plaque de traction et une barre d'ouverture/fermeture. Le trépied est soudé sous une poutre de piste d'un support de moule externe. Une extrémité du vérin à l'huile d'ouverture/fermeture est articulée sur une tige verticale du trépied et fixée à celle-ci, et l'autre extrémité du vérin à l'huile d'ouverture/fermeture est articulée sur la barre d'ouverture/fermeture. La barre d'ouverture/fermeture est articulée sur une arête arrière d'un gabarit externe, et l'autre extrémité de la barre d'ouverture/fermeture est articulée sur l'extrémité inférieure de la tige verticale du trépied. Une extrémité de la plaque de traction est articulée sur la surface latérale de la poutre de piste, et l'autre extrémité de la plaque de traction est articulée sur une poutre de plateforme sur l'arrière du gabarit. La présente invention permet d'améliorer le niveau d'automatisation et d'intelligence de l'appareil dans chaque procédé de construction de tour principale.
本发明公开了一种用于桥塔工业化建造的一体化智能筑塔装置及方法,包括:架体、自动爬升机构、模板系统、振捣系统、布料系统、开合机构、养护系统及模板自动清理机器人组成;所述开合机构包括:三角架、开合油缸、拉板及开合梁;所述三角架焊接于外模支架的走道梁下方,开合油缸一端铰接固定在三角架竖杆上,开合油缸另一端铰接在开合梁上,开合梁与外模板背楞铰接,开合梁另一端与三角架竖杆的下端铰接,拉板的一端与走道梁的侧面铰接,拉板的另一端铰接于模板背部平台梁上。本发明实现了装备在主塔施工各工序的自动化、智能化水平的提高。
INTEGRATED INTELLIGENT TOWER BUILDING APPARATUS FOR INDUSTRIAL CONSTRUCTION OF BRIDGE TOWER AND METHOD
APPAREIL DE CONSTRUCTION DE TOUR INTELLIGENTE INTÉGRÉE POUR CONSTRUCTION INDUSTRIELLE D'UNE TOUR DE PONT ET PROCÉDÉ
一种用于桥塔工业化建造的一体化智能筑塔装置及方法
ZHANG HONG (author) / ZHANG YONGTAO (author) / TIAN WEI (author) / LI BAZHOU (author) / CHEN MING (author) / YANG XIULI (author) / XIAO WENFU (author) / HUANG HOUQING (author) / SU YAN (author) / LI YANG (author)
2025-01-02
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Integrated intelligent tower building machine for industrial building of bridge tower
European Patent Office | 2023
|Intelligent tower building device for steel tower construction
European Patent Office | 2023
|Multifunctional integrated intelligent tower building platform
European Patent Office | 2023
|Low lower tower column bridge tower and construction method
European Patent Office | 2023
|