The present application relates to a jacking-type reverse construction method, comprising the following steps: prefabricating, in a factory, vertical prefabricated parts for assembling a building structure; setting up a jacking system at a construction site, wherein the jacking system comprises a plurality of jacks, each jack comprising a telescopic jacking rod; setting up a horizontal floorslab mold at the construction site; on the horizontal floorslab mold, casting a horizontal floorslab that forms a top-floor roof; and a floor construction step, which comprises: jacking the previous cast horizontal floorslab, assembling the vertical prefabricated parts, making the jacking rods descend, and casting the horizontal floorslab. The step of assembling the vertical prefabricated parts comprises: firstly, the jacking rods corresponding to the currently assembled vertical prefabricated part in terms of position being controlled to retract; after the currently assembled vertical prefabricated part is mounted in place, controlling the corresponding jacking rods to extend out for support; and repeating the process until the assembly of all the vertical prefabricated parts on the present floor is completed. The construction method can reduce works at heights, reduce costs, and shorten the construction period.
La présente demande concerne un procédé de construction inverse de type à levage à vérins, comprenant les étapes suivantes : préfabriquer, en usine, des pièces préfabriquées verticales pour l'assemblage d'une structure de bâtiment ; installer un système de levage à vérins au niveau d'un site de construction, le système de levage comprenant une pluralité de vérins, chaque vérin comprenant une tige de levage télescopique ; installer un moule de dalle de plancher horizontale sur le site de construction ; sur le moule de dalle de plancher horizontale, couler une dalle de plancher horizontale qui forme un toit de plancher supérieur ; et une étape de construction de plancher, qui consiste à : lever la dalle de plancher horizontale coulée précédente, assembler les parties préfabriquées verticales, descendre les tiges de levage, et couler la dalle de plancher horizontale. L'étape d'assemblage des pièces préfabriquées verticales consiste à : tout d'abord, les tiges de levage correspondant à la pièce préfabriquée verticale actuellement assemblée en termes de position sont commandées pour se rétracter ; après que la pièce préfabriquée verticale actuellement assemblée ait été montée en place, commander les tiges de levage correspondantes pour qu'elles s'étendent hors du support ; et répéter le processus jusqu'à ce que l'assemblage de toutes les pièces préfabriquées verticales sur le présent plancher soit achevé. Le procédé de construction peut réduire les travaux en hauteur, réduire les coûts et raccourcir la période de construction.
本申请涉及一种顶升式逆作施工方法,包括以下步骤:在工厂预制出用于装配楼体结构的竖向预制构件;在施工现场设立顶升系统,顶升系统包括多个千斤顶,每个千斤顶包括一个可伸缩的顶升杆;在施工现场设立水平楼板模具;在水平楼板模具之上浇筑形成构成顶层顶板的水平楼板;楼层施工步骤,包括:前一次浇筑成型的水平楼板顶升、竖向预制构件组装、顶升杆回落、水平楼板浇筑,在竖向预制构件组装步骤中,先控制与当前组装的竖向预制构件的位置对应的顶升杆缩回,将当前组装的竖向预制构件安装到位后,控制对应的顶升杆伸出并进行支撑,重复上述过程至完成本楼层所有竖向预制构件的组装。该施工方法可减少高空作业,降低成本,缩短工期。
The present application relates to a jacking-type reverse construction method, comprising the following steps: prefabricating, in a factory, vertical prefabricated parts for assembling a building structure; setting up a jacking system at a construction site, wherein the jacking system comprises a plurality of jacks, each jack comprising a telescopic jacking rod; setting up a horizontal floorslab mold at the construction site; on the horizontal floorslab mold, casting a horizontal floorslab that forms a top-floor roof; and a floor construction step, which comprises: jacking the previous cast horizontal floorslab, assembling the vertical prefabricated parts, making the jacking rods descend, and casting the horizontal floorslab. The step of assembling the vertical prefabricated parts comprises: firstly, the jacking rods corresponding to the currently assembled vertical prefabricated part in terms of position being controlled to retract; after the currently assembled vertical prefabricated part is mounted in place, controlling the corresponding jacking rods to extend out for support; and repeating the process until the assembly of all the vertical prefabricated parts on the present floor is completed. The construction method can reduce works at heights, reduce costs, and shorten the construction period.
La présente demande concerne un procédé de construction inverse de type à levage à vérins, comprenant les étapes suivantes : préfabriquer, en usine, des pièces préfabriquées verticales pour l'assemblage d'une structure de bâtiment ; installer un système de levage à vérins au niveau d'un site de construction, le système de levage comprenant une pluralité de vérins, chaque vérin comprenant une tige de levage télescopique ; installer un moule de dalle de plancher horizontale sur le site de construction ; sur le moule de dalle de plancher horizontale, couler une dalle de plancher horizontale qui forme un toit de plancher supérieur ; et une étape de construction de plancher, qui consiste à : lever la dalle de plancher horizontale coulée précédente, assembler les parties préfabriquées verticales, descendre les tiges de levage, et couler la dalle de plancher horizontale. L'étape d'assemblage des pièces préfabriquées verticales consiste à : tout d'abord, les tiges de levage correspondant à la pièce préfabriquée verticale actuellement assemblée en termes de position sont commandées pour se rétracter ; après que la pièce préfabriquée verticale actuellement assemblée ait été montée en place, commander les tiges de levage correspondantes pour qu'elles s'étendent hors du support ; et répéter le processus jusqu'à ce que l'assemblage de toutes les pièces préfabriquées verticales sur le présent plancher soit achevé. Le procédé de construction peut réduire les travaux en hauteur, réduire les coûts et raccourcir la période de construction.
本申请涉及一种顶升式逆作施工方法,包括以下步骤:在工厂预制出用于装配楼体结构的竖向预制构件;在施工现场设立顶升系统,顶升系统包括多个千斤顶,每个千斤顶包括一个可伸缩的顶升杆;在施工现场设立水平楼板模具;在水平楼板模具之上浇筑形成构成顶层顶板的水平楼板;楼层施工步骤,包括:前一次浇筑成型的水平楼板顶升、竖向预制构件组装、顶升杆回落、水平楼板浇筑,在竖向预制构件组装步骤中,先控制与当前组装的竖向预制构件的位置对应的顶升杆缩回,将当前组装的竖向预制构件安装到位后,控制对应的顶升杆伸出并进行支撑,重复上述过程至完成本楼层所有竖向预制构件的组装。该施工方法可减少高空作业,降低成本,缩短工期。
JACKING-TYPE REVERSE CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION INVERSE DE TYPE À LEVAGE À VÉRINS
顶升式逆作施工方法
2025-01-02
Patent
Electronic Resource
Chinese
Reverse pre-jacking type anchorage and construction method thereof
European Patent Office | 2024
|Reverse construction method for pipe-jacking bricked working well
European Patent Office | 2021
|Building structure reverse jacking reinforcing device and construction method thereof
European Patent Office | 2024
|