Jacking pipe reverse recovery construction method
The invention provides a jacking pipe reverse recovery construction method, and relates to the field of jacking pipe recovery of a jacking pipe heading machine. The jacking pipe reverse recovery construction method comprises the following steps that a stress shoulder pole is transversely arranged in a working well and connected with I-shaped steel through welding to form a reaction frame; a jack is arranged on the reaction frame, and a jacking pipe is reversely pulled backwards and recovered through the jack; in the initial stage of jacking pipe reverse recovery, a deviation rectifying oil cylinder of the jacking pipe heading machine is synchronously started to assist reverse recovery; in the jacking pipe reverse recovery process, grouting reinforcement is conducted through an inner ring water channel of the jacking pipe heading machine and a vertical shaft type core geological exploration drilling machine, and sedimentation of a soil layer above a rail is controllable; in the jacking pipe reverse recovery process, thixotropic slurry is synchronously injected outwards to the outer walls of pipe joints through the jacking pipe heading machine, and the frictional resistance of a soil body in the recovery process is reduced; and all the pipe joints of the jacking pipe are hoisted out one by one till a machine head retreats, and a hole is blocked. The jacking pipe reverse recovery construction method overcomes the various defects that a traditional jacking pipe transformation construction method is poor in effect, high in risk, long in construction period and the like.
一种顶管逆向回收施工方法,涉及顶管掘进机顶管回收领域,包括以下步骤:在工作井内横置受力扁担,通过焊接使其与工字钢相连接,形成反力架;在所述反力架设置千斤顶,通过千斤顶对顶管进行逆向后拉回收;顶管逆向回收的初始阶段,同步启动顶管掘进机的纠偏油缸,辅助逆向回收;顶管逆向回收过程中,通过顶管掘进机内环水道与立轴式岩心地质勘探钻机进行注浆加固,确保轨道上方土层的沉降可控;顶管逆向回收过程中,顶管掘进机向管节外壁同步向外压注触变泥浆,减少回收过程中土体的摩阻力;顶管的每节管节一一吊出,直至机头退出,对洞口进行封堵,本发明解决传统顶管改造施工法效果差、风险大、工期长等多种弊端。
Jacking pipe reverse recovery construction method
The invention provides a jacking pipe reverse recovery construction method, and relates to the field of jacking pipe recovery of a jacking pipe heading machine. The jacking pipe reverse recovery construction method comprises the following steps that a stress shoulder pole is transversely arranged in a working well and connected with I-shaped steel through welding to form a reaction frame; a jack is arranged on the reaction frame, and a jacking pipe is reversely pulled backwards and recovered through the jack; in the initial stage of jacking pipe reverse recovery, a deviation rectifying oil cylinder of the jacking pipe heading machine is synchronously started to assist reverse recovery; in the jacking pipe reverse recovery process, grouting reinforcement is conducted through an inner ring water channel of the jacking pipe heading machine and a vertical shaft type core geological exploration drilling machine, and sedimentation of a soil layer above a rail is controllable; in the jacking pipe reverse recovery process, thixotropic slurry is synchronously injected outwards to the outer walls of pipe joints through the jacking pipe heading machine, and the frictional resistance of a soil body in the recovery process is reduced; and all the pipe joints of the jacking pipe are hoisted out one by one till a machine head retreats, and a hole is blocked. The jacking pipe reverse recovery construction method overcomes the various defects that a traditional jacking pipe transformation construction method is poor in effect, high in risk, long in construction period and the like.
一种顶管逆向回收施工方法,涉及顶管掘进机顶管回收领域,包括以下步骤:在工作井内横置受力扁担,通过焊接使其与工字钢相连接,形成反力架;在所述反力架设置千斤顶,通过千斤顶对顶管进行逆向后拉回收;顶管逆向回收的初始阶段,同步启动顶管掘进机的纠偏油缸,辅助逆向回收;顶管逆向回收过程中,通过顶管掘进机内环水道与立轴式岩心地质勘探钻机进行注浆加固,确保轨道上方土层的沉降可控;顶管逆向回收过程中,顶管掘进机向管节外壁同步向外压注触变泥浆,减少回收过程中土体的摩阻力;顶管的每节管节一一吊出,直至机头退出,对洞口进行封堵,本发明解决传统顶管改造施工法效果差、风险大、工期长等多种弊端。
Jacking pipe reverse recovery construction method
一种顶管逆向回收施工方法
LUO CHUANZHOU (author) / ZHAO XIAOLANG (author) / HU JISHENG (author) / DENG HAILIN (author) / LI ZHIJING (author)
2021-06-18
Patent
Electronic Resource
Chinese
Reverse construction method for pipe-jacking bricked working well
European Patent Office | 2021
|Pipe jacking device and pipe jacking construction process
European Patent Office | 2020
|