A platform for research: civil engineering, architecture and urbanism
An investigation of the feasibility of establishing density proctors for mine sources providing pavement base materials to Florida Department of Transportation (FDOT) projects was concluded. Research procedure involved statistical analysis of test data from 69 mines for the period 1999-2004. Additionally, field densities and field laboratory proctor densities were compared to mine test values. Procedures for offering an option to utilize a previously established mine proctor in lieu of laboratory proctor testing of project delivered material was suggested. The proposed alternative would eliminate the 4 to 5 day waiting time for laboratory proctor results.
An investigation of the feasibility of establishing density proctors for mine sources providing pavement base materials to Florida Department of Transportation (FDOT) projects was concluded. Research procedure involved statistical analysis of test data from 69 mines for the period 1999-2004. Additionally, field densities and field laboratory proctor densities were compared to mine test values. Procedures for offering an option to utilize a previously established mine proctor in lieu of laboratory proctor testing of project delivered material was suggested. The proposed alternative would eliminate the 4 to 5 day waiting time for laboratory proctor results.
Development of Procedures for Utilizing Pit Proctors in the FDOT Construction Process for Construction of Pavement Base Materials
2005
80 pages
Report
No indication
English
Construction Equipment, Materials, & Supplies , Highway Engineering , Mineral Industries , Pavement base materials , Feasibility studies , Literature reviews , Research methodologies , Recommendations , Mine sources , Statistical analysis , Mine test values , Procedures development , Florida , Construction , Mine proctors , Laboratory proctor testing , Pavements , Density protors , Pit proctors