A platform for research: civil engineering, architecture and urbanism
Grouting and Materials Control. Project Officers Report. Project 3.5 of Operation Flint Lock, Shot Pile Driver
For abstract, see NSA 25 05, number 08962.
Grouting and Materials Control. Project Officers Report. Project 3.5 of Operation Flint Lock, Shot Pile Driver
For abstract, see NSA 25 05, number 08962.
Grouting and Materials Control. Project Officers Report. Project 3.5 of Operation Flint Lock, Shot Pile Driver
G. C. Hoff (author) / R. L. Stowe (author) / W. L. Burnett (author)
1969
241 pages
Report
No indication
English