A platform for research: civil engineering, architecture and urbanism
Project F-401, S-202-E (Preliminary), Lauderdale County, Alabama
The purpose of the proposed project is to provide an adequate highway facility within the project limits. There will be 11 residences and 1 business displaced. A required bridge will cause minor erosion of the fill slopes in case of sudden rains during construction which will affect the fish habitat near the bridge structure. There will be additional noise after construction due to the increased traffic and there will be additional noise and dust due to roadway and bridge building equipment during the construction period.
Project F-401, S-202-E (Preliminary), Lauderdale County, Alabama
The purpose of the proposed project is to provide an adequate highway facility within the project limits. There will be 11 residences and 1 business displaced. A required bridge will cause minor erosion of the fill slopes in case of sudden rains during construction which will affect the fish habitat near the bridge structure. There will be additional noise after construction due to the increased traffic and there will be additional noise and dust due to roadway and bridge building equipment during the construction period.
Project F-401, S-202-E (Preliminary), Lauderdale County, Alabama
1971
11 pages
Report
No indication
English
Project S-6109(101), Talladega County, Alabama
NTIS | 1972
Project S-2607(101), Elmore County, Alabama
NTIS | 1971