A platform for research: civil engineering, architecture and urbanism
Continuously - Reinforced Concrete Pavement Observation Program in Mississippi
The report covers the second year of a five year observation study of continuouslyreinforced concrete pavement construction in Mississippi. Measurements from the Desoto County and Jones County experimental projects constructed in 1961 and 1962 were continued. Their design features, data on end movement, crack width and crack frequency are presented and discussed. A preliminary review of the design and construction statistics and the state-wide crack survey of all completed projects was made. (Author)
Continuously - Reinforced Concrete Pavement Observation Program in Mississippi
The report covers the second year of a five year observation study of continuouslyreinforced concrete pavement construction in Mississippi. Measurements from the Desoto County and Jones County experimental projects constructed in 1961 and 1962 were continued. Their design features, data on end movement, crack width and crack frequency are presented and discussed. A preliminary review of the design and construction statistics and the state-wide crack survey of all completed projects was made. (Author)
Continuously - Reinforced Concrete Pavement Observation Program in Mississippi
T. C. Teng (author)
1969
60 pages
Report
No indication
English
Continuously reinforced concrete pavement
TIBKAT | 1973
|Continuously Reinforced Concrete Pavement
NTIS | 1970
|Continuously-reinforced concrete pavement
Engineering Index Backfile | 1963