A platform for research: civil engineering, architecture and urbanism
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
Ghasri, Milad (author) / Maghrebi, Mojtaba / Rashidi, Taha Hossein / Waller, S. Travis
2016
Article (Journal)
English
BKL:
56.03
Methoden im Bauingenieurwesen
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
British Library Online Contents | 2016
|Concrete pouring equipment for construction site building construction
European Patent Office | 2022
|Concrete on-site pouring process for building construction
European Patent Office | 2024
|Construction site concrete pouring monitoring system and method
European Patent Office | 2024
|