A platform for research: civil engineering, architecture and urbanism
Upgrading Toronto's University subway line ventilation system
This paper presents the results of work undertaken as part of the Toronto Transit Commission's University Subway Line Fire Ventilation Upgrade Program. The design intent is to upgrade, to the greatest extent practical, the tunnel ventilation system to meet the current National Fire Protection Association (NFPA) 130 Standard for Fixed Guideway Transit and Passenger Rail Systems (TTC Fire Ventilation Upgrade Project Technical Criteria Report, Third Draft, 18 August 2005). The existing tunnel ventilation system is not fire-rated and does not have the necessary capacity for maintaining a smoke-free egress route in the event of any fire larger than a nuisance fire. The work has involved investigating the potential for both upgrading the existing fans and for installing new fans in existing blast relief shafts. During normal operating conditions the requirement for blast relief in order to alleviate the piston effect of trains is necessary. Hence the installation of fans in blast relief shafts would require that the fans are allowed to 'free wheel' when not in operation, allowing blast relief through the fans themselves.
Upgrading Toronto's University subway line ventilation system
This paper presents the results of work undertaken as part of the Toronto Transit Commission's University Subway Line Fire Ventilation Upgrade Program. The design intent is to upgrade, to the greatest extent practical, the tunnel ventilation system to meet the current National Fire Protection Association (NFPA) 130 Standard for Fixed Guideway Transit and Passenger Rail Systems (TTC Fire Ventilation Upgrade Project Technical Criteria Report, Third Draft, 18 August 2005). The existing tunnel ventilation system is not fire-rated and does not have the necessary capacity for maintaining a smoke-free egress route in the event of any fire larger than a nuisance fire. The work has involved investigating the potential for both upgrading the existing fans and for installing new fans in existing blast relief shafts. During normal operating conditions the requirement for blast relief in order to alleviate the piston effect of trains is necessary. Hence the installation of fans in blast relief shafts would require that the fans are allowed to 'free wheel' when not in operation, allowing blast relief through the fans themselves.
Upgrading Toronto's University subway line ventilation system
Aufrüstung des Lüftungssystems der U-Bahnlinie University Line in Toronto
Rhodes, N. (author) / McCulloch, M. (author) / Wong, H.W. (author)
2007
11 Seiten, 9 Bilder, 2 Tabellen, 2 Quellen
Conference paper
English
Toronto's cover-then-cut subway
Engineering Index Backfile | 1960
Underground Construction for Toronto's Subway Expansion
British Library Conference Proceedings | 1998
|Construction procedure on Toronto's rapid-transit subway
Engineering Index Backfile | 1949
|Second stage of Toronto's rapid-transit subway construction
Engineering Index Backfile | 1950
Sanitary and storm drainage problems on Toronto's new subway
Engineering Index Backfile | 1953