Key Technology Analysis of Construction of Joint-Pipe Method for Ultra-Deep Diaphragm Wall
Based on a ultra-deep diaphragm wall of Pangduo hydropower station, time of pipe drawn and drawn force under different times and hole deviation was researched. Field test was used to verify analysis conclusion. The results show that drawn time is 7~8 hours after concrete pouring, that is 40m high concrete after pouring. Several factors has effect on drawn force which relates to contact characters between sliding pipe and concrete and hole deviation.
Key Technology Analysis of Construction of Joint-Pipe Method for Ultra-Deep Diaphragm Wall
Based on a ultra-deep diaphragm wall of Pangduo hydropower station, time of pipe drawn and drawn force under different times and hole deviation was researched. Field test was used to verify analysis conclusion. The results show that drawn time is 7~8 hours after concrete pouring, that is 40m high concrete after pouring. Several factors has effect on drawn force which relates to contact characters between sliding pipe and concrete and hole deviation.
Key Technology Analysis of Construction of Joint-Pipe Method for Ultra-Deep Diaphragm Wall
Applied Mechanics and Materials ; 351-352 ; 915-918
2013-08-08
4 pages
Article (Journal)
Electronic Resource
English
Key Technology Analysis of Construction of Joint-Pipe Method for Ultra-Deep Diaphragm Wall
British Library Conference Proceedings | 2013
|Reducing joint of ultra-deep diaphragm wall joint pipe joint and construction method
European Patent Office | 2024
|Waterproof curtain ultra-deep diaphragm wall joint box and construction method
European Patent Office | 2022
|Construction method of ultra-deep underground diaphragm wall
European Patent Office | 2024
|Ultra-deep underground diaphragm wall and construction method