Solutions for the sustainable reduction of the tipping requirement at the Koralm tunnelLösungen zur nachhaltigen Verringerung des Deponieerfordernisses beim Koralmtunnel
The Koralmbahn railway line between Graz and Klagenfurt is an essential part of the Baltic‐Adriatic corridor. The new high‐speed rail link will create new capacities and provide much better conditions for environmentally friendly rail goods traffic. The current journey times for passenger traffic will be considerably reduced. The Koralm tunnel with a length of about 32.9 km is the core piece of the new Koralmbahn. The tunnelling work will produce about 5 m m3 of excavated material in the consolidated state. For this reason, work on a programme for the economic and environmentally friendly processing of the material to be excavated from the tunnel has been undertaken since the earliest design phases, the aim being the highest possible degree of recycling and the lowest possible need for tipping.
Die Koralmbahn zwischen Graz und Klagenfurt stellt ein maßgebliches Teilstück im Rahmen des Baltisch‐Adriatischen Korridors dar. Mit dieser neuen Eisenbahn‐Hochleistungsverbindung werden neue Kapazitäten und deutlich verbesserte Voraussetzungen für den umweltfreundlichen Bahngüterverkehr geschaffen. Im Personenverkehr wird die derzeitige Fahrzeit erheblich reduziert. Der Koralmtunnel stellt mit einer Länge von rund 32,9 km das Kernstück der neuen Koralmbahn dar. Im Zuge des Tunnelbaus fallen im festen Zustand rund 5 Mio. m3 Ausbruchmassen an. Daher wurde bereits seit den frühesten Planungsphasen konsequent an einem Programm für den wirtschaftlichen und umweltfreundlichen Umgang mit diesem Tunnelausbruchmaterial, mit dem Ziel möglichst hoher Wiederverwendung und möglichst geringem Deponierungserfordernis, gearbeitet.
Solutions for the sustainable reduction of the tipping requirement at the Koralm tunnelLösungen zur nachhaltigen Verringerung des Deponieerfordernisses beim Koralmtunnel
The Koralmbahn railway line between Graz and Klagenfurt is an essential part of the Baltic‐Adriatic corridor. The new high‐speed rail link will create new capacities and provide much better conditions for environmentally friendly rail goods traffic. The current journey times for passenger traffic will be considerably reduced. The Koralm tunnel with a length of about 32.9 km is the core piece of the new Koralmbahn. The tunnelling work will produce about 5 m m3 of excavated material in the consolidated state. For this reason, work on a programme for the economic and environmentally friendly processing of the material to be excavated from the tunnel has been undertaken since the earliest design phases, the aim being the highest possible degree of recycling and the lowest possible need for tipping.
Die Koralmbahn zwischen Graz und Klagenfurt stellt ein maßgebliches Teilstück im Rahmen des Baltisch‐Adriatischen Korridors dar. Mit dieser neuen Eisenbahn‐Hochleistungsverbindung werden neue Kapazitäten und deutlich verbesserte Voraussetzungen für den umweltfreundlichen Bahngüterverkehr geschaffen. Im Personenverkehr wird die derzeitige Fahrzeit erheblich reduziert. Der Koralmtunnel stellt mit einer Länge von rund 32,9 km das Kernstück der neuen Koralmbahn dar. Im Zuge des Tunnelbaus fallen im festen Zustand rund 5 Mio. m3 Ausbruchmassen an. Daher wurde bereits seit den frühesten Planungsphasen konsequent an einem Programm für den wirtschaftlichen und umweltfreundlichen Umgang mit diesem Tunnelausbruchmaterial, mit dem Ziel möglichst hoher Wiederverwendung und möglichst geringem Deponierungserfordernis, gearbeitet.
Solutions for the sustainable reduction of the tipping requirement at the Koralm tunnelLösungen zur nachhaltigen Verringerung des Deponieerfordernisses beim Koralmtunnel
Harer, Gerhard (author) / Pichler, Peter (author)
Geomechanics and Tunnelling ; 2 ; 627-632
2009-10-01
6 pages
Article (Journal)
Electronic Resource
English
Solutions for the sustainable reduction of the tipping requirement at the Koralm tunnel
Tema Archive | 2009
|Geodätische Herausforderungen beim Projekt "Koralmtunnel"
IuD Bahn | 2010
|Wiley | 2008
|