Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the underground ventilation station while shield machines pass 1.5 m underneath
Construction of the underground ventilation station while shield machines pass 1.5 m underneath
Construction of the underground ventilation station while shield machines pass 1.5 m underneath
Inose, K. (Autor:in) / Kamegaya, I. (Autor:in) / Ueda, A. (Autor:in) / Tomii, T. (Autor:in) / Imanaka, Y. (Autor:in) / Lee, I.-M. / Yoo, C. / You, K.-H. / International Tunnelling Association
AITES-ITA world tunnel congress; Safety in the underground space ; 2006 ; Seoul
01.01.2006
2 pages
CD-ROM in pocket attached to inside back cover of journal issue
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Online Contents | 2006
|Construction of the underground ventilation station while shield machines pass 1.5m underneath
British Library Online Contents | 2006
|Construction method for shield machine to underneath pass through underground continuous wall
Europäisches Patentamt | 2020
|