Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Inose, Kenichi (Autor:in) / Kamegaya, Isao / Ueda, Akio / Tomii, Takayoshi / Imanaka, Yasutaka
2006
Aufsatz (Zeitschrift)
Unbekannt
BKL:
56.22
Unterirdisches Bauen, Tunnelbau
Construction of the underground ventilation station while shield machines pass 1.5m underneath
British Library Online Contents | 2006
|Construction of the underground ventilation station while shield machines pass 1.5 m underneath
British Library Conference Proceedings | 2006
|Construction method for shield machine to underneath pass through underground continuous wall
Europäisches Patentamt | 2020
|