Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Inose, K. (Autor:in) / Kamegaya, I. (Autor:in) / Ueda, A. (Autor:in) / Tomii, T. (Autor:in) / Imanaka, Y. (Autor:in)
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY ; 21 ; 335-336
01.01.2006
2 pages
Aufsatz (Zeitschrift)
Englisch
DDC:
624.193
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Construction of the underground ventilation station while shield machines pass 1.5m underneath
Online Contents | 2006
|Construction of the underground ventilation station while shield machines pass 1.5 m underneath
British Library Conference Proceedings | 2006
|Construction method for shield machine to underneath pass through underground continuous wall
Europäisches Patentamt | 2020
|