Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Consolidation of floor dust on mine roadways
Trials made in South Yorkshire coal field; principle involved is to bind floor dust with sufficient water (about 10%) to make dust into plastic and nearly firm carpet; deliquescent material added in amount to maintain 10% of moisture in floor material; dust should first be wetted by water containing wetting agent; cost data. Before Midland Inst Min Engrs. (See also - n 4570 Aug 13 1948 p 199-204 (discussion); Instn Min Engrs -- Trans v 107 Pt 11 Aug 1948 p 631-42 (discussion) 642-4, supp plate following p 650; Iron and Coal Trades Rev v 157 n 4197 Aug 20 1938 p 405-6)
Consolidation of floor dust on mine roadways
Trials made in South Yorkshire coal field; principle involved is to bind floor dust with sufficient water (about 10%) to make dust into plastic and nearly firm carpet; deliquescent material added in amount to maintain 10% of moisture in floor material; dust should first be wetted by water containing wetting agent; cost data. Before Midland Inst Min Engrs. (See also - n 4570 Aug 13 1948 p 199-204 (discussion); Instn Min Engrs -- Trans v 107 Pt 11 Aug 1948 p 631-42 (discussion) 642-4, supp plate following p 650; Iron and Coal Trades Rev v 157 n 4197 Aug 20 1938 p 405-6)
Consolidation of floor dust on mine roadways
Colliery Guardian
Bradshaw, F. (Autor:in) / Tideswell, F.V. (Autor:in)
Colliery Guardian ; 177
1948
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Floor reinforcement in longwall roadways
British Library Conference Proceedings | 1992
|Strata control in mine roadways
Engineering Index Backfile | 1964
|Economy of supports in mine roadways
Engineering Index Backfile | 1941
|