Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Big finishers speed bridge deck paving
Placing of light weight deck on Richmond-San Rafael Bridge by means of three pavement finishing machines of 36-ft span; normal progress per day is 100 to 200 ft; topping light weight concrete is 1/2 in. thick of rich mortar wearing surface.
Big finishers speed bridge deck paving
Placing of light weight deck on Richmond-San Rafael Bridge by means of three pavement finishing machines of 36-ft span; normal progress per day is 100 to 200 ft; topping light weight concrete is 1/2 in. thick of rich mortar wearing surface.
Big finishers speed bridge deck paving
Eng News-Rec
Engineering News-Record ; 154
1955
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge deck waterproof coiled material paving device and paving method
Europäisches Patentamt | 2021
|Epoxy paving cement fights bridge deck wear
Engineering Index Backfile | 1965
|