Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete cutoff wall protects dam foundation from river
Construction of earth dam for Colombia Guatavita pumped storage project; dam relies on narrow 255 ft deep concrete cutoff wall on upstream side of dam to seal off underlying sand and gravel layer from river; featuring 2 earth embankments, with hill separating main dam from auxiliary dike, embankments are constructed with inclined clay core parallel to upstream slope.
Concrete cutoff wall protects dam foundation from river
Construction of earth dam for Colombia Guatavita pumped storage project; dam relies on narrow 255 ft deep concrete cutoff wall on upstream side of dam to seal off underlying sand and gravel layer from river; featuring 2 earth embankments, with hill separating main dam from auxiliary dike, embankments are constructed with inclined clay core parallel to upstream slope.
Concrete cutoff wall protects dam foundation from river
Eng News-Rec
Engineering News-Record ; 170
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Foundation cutoff wall -- Allegheny reservoir dam
Engineering Index Backfile | 1966
|Construction method of vertical cutoff wall foundation
Europäisches Patentamt | 2021
|Concrete cutoff wall drilled down 250 Ft
Engineering Index Backfile | 1963
|