Manual hole digging pile composite construction equipment and method for quicksand layer geology
The invention discloses manual hole digging pile composite construction equipment for quicksand layer geology, and relates to the field of pile foundation construction equipment. The equipment comprises full-automatic steel cylinder equipment; the full-automatic steel cylinder equipment is composed of a steel cylinder formwork and a supporting system; the steel cylinder formwork is formed by alternately assembling main body circular curved plates and auxiliary body telescopic plates; one end of an upper supporting frame of the supporting system is hinged to the main body circular curved plates, and the other end of the upper supporting frame of the supporting system is hinged to a first connecting rectangular cylinder; one end of a lower supporting frame is fixedly connected with the middle of the upper supporting frame, and the other end of the lower supporting frame is hinged to a second connecting rectangular cylinder; the first connecting rectangular cylinder and the second connecting rectangular cylinder are arranged opposite to each other; the lower end of a telescopic rod is fixedly connected with the second connecting rectangular cylinder; and the middle of the lower end ofthe telescopic rod is connected with the first connecting rectangular cylinder. The manual hole digging pile composite construction equipment for quicksand layer geology has the beneficial effects that a spring is used for buffering and damping, and a preset round rod balls can ensure that a pile hole does not deviate, so that the deviation of the pile hole can be effectively controlled; and theoperation is convenient, safe and reliable, and the construction progress can be accelerated.
本发明公开了一种用于流砂层地质的人工挖孔桩复合型施工设备,涉及桩基施工设备领域,包括全自动钢圆筒设备,其由钢圆筒模板和支撑系统组成,钢圆筒模板由主体圆曲板及副体伸缩板交替拼装而成;支撑系统的上部支撑架的一端与主体圆曲板铰接,其另一端铰接在第一连接矩形筒上,下部支撑架一端与上部支撑架中部固定连接,其另一端与第二连接矩形筒铰接;所述第一连接矩形筒与第二连接矩形筒上下相对设置,伸缩杆下端与第二连接矩形筒固定连接,伸缩杆下端中部与第一连接矩形筒连接。有益效果为:全自动钢圆筒支撑系统中弹簧缓冲减振以及预先设定好的圆杆球可保证桩孔不偏位,可有效控制桩孔偏差。且操作方便,安全可靠,可加快施工进度。
Manual hole digging pile composite construction equipment and method for quicksand layer geology
The invention discloses manual hole digging pile composite construction equipment for quicksand layer geology, and relates to the field of pile foundation construction equipment. The equipment comprises full-automatic steel cylinder equipment; the full-automatic steel cylinder equipment is composed of a steel cylinder formwork and a supporting system; the steel cylinder formwork is formed by alternately assembling main body circular curved plates and auxiliary body telescopic plates; one end of an upper supporting frame of the supporting system is hinged to the main body circular curved plates, and the other end of the upper supporting frame of the supporting system is hinged to a first connecting rectangular cylinder; one end of a lower supporting frame is fixedly connected with the middle of the upper supporting frame, and the other end of the lower supporting frame is hinged to a second connecting rectangular cylinder; the first connecting rectangular cylinder and the second connecting rectangular cylinder are arranged opposite to each other; the lower end of a telescopic rod is fixedly connected with the second connecting rectangular cylinder; and the middle of the lower end ofthe telescopic rod is connected with the first connecting rectangular cylinder. The manual hole digging pile composite construction equipment for quicksand layer geology has the beneficial effects that a spring is used for buffering and damping, and a preset round rod balls can ensure that a pile hole does not deviate, so that the deviation of the pile hole can be effectively controlled; and theoperation is convenient, safe and reliable, and the construction progress can be accelerated.
本发明公开了一种用于流砂层地质的人工挖孔桩复合型施工设备,涉及桩基施工设备领域,包括全自动钢圆筒设备,其由钢圆筒模板和支撑系统组成,钢圆筒模板由主体圆曲板及副体伸缩板交替拼装而成;支撑系统的上部支撑架的一端与主体圆曲板铰接,其另一端铰接在第一连接矩形筒上,下部支撑架一端与上部支撑架中部固定连接,其另一端与第二连接矩形筒铰接;所述第一连接矩形筒与第二连接矩形筒上下相对设置,伸缩杆下端与第二连接矩形筒固定连接,伸缩杆下端中部与第一连接矩形筒连接。有益效果为:全自动钢圆筒支撑系统中弹簧缓冲减振以及预先设定好的圆杆球可保证桩孔不偏位,可有效控制桩孔偏差。且操作方便,安全可靠,可加快施工进度。
Manual hole digging pile composite construction equipment and method for quicksand layer geology
一种用于流砂层地质的人工挖孔桩复合型施工设备及方法
CHEN HUIBIN (Autor:in) / JIANG PENGMING (Autor:in) / ZHOU AIZHAO (Autor:in) / HOU HEYING (Autor:in) / PAN ZHUOJIE (Autor:in) / HU ZHEN (Autor:in) / HUANG XIANWEN (Autor:in) / LU ZUCHENG (Autor:in)
22.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Manual hole digging pile quicksand layer protection device and construction method thereof
Europäisches Patentamt | 2021
|Safe pile-forming construction method for manual hole digging pile in quicksand lot
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2020
|Method for treating quicksand in digging hole of manual digging pile by light well point dewatering
Europäisches Patentamt | 2020
|Manual hole digging pile and construction method of manual hole digging pile
Europäisches Patentamt | 2020
|