Construction method for filling prefabricated building blocks with foaming slurry in road construction
The invention discloses a construction method for filling prefabricated building blocks with foaming slurry in road construction, which comprises the following steps: S1, early-stage preparation work of roadbed construction: firstly carrying out measurement, paying-off and soil test on a roadbed, S2, building and leveling the roadbed, S3, compacting the roadbed on the basis of S2, S4, preparation work, S5, construction lofting, S5, early-stage preparation work of roadbed construction, S5, carrying out early-stage preparation work of roadbed construction, S5, carrying out early-stage preparation work of roadbed construction, and S5, carrying out early-stage preparation work of roadbed construction. The construction method comprises the following steps of S1, arranging a uniform layer on a roadbed, S6, stacking foamed concrete blocks and the uniform layer on the roadbed with the uniform thickness, S7, laying the foamed concrete blocks, and S8, shaping and rolling. A traditional engineering road poured by cement is replaced by a road laid by the concrete blocks, the current block number can be replaced when a plurality of blocks are damaged, and the construction efficiency is improved. Construction roads in the area do not need to be shoveled, and pouring and maintenance do not need to be conducted again, and vigorous popularization is suggested.
本发明公开了一种采用发泡浆体填灌预制砌块在道路施工中的施工方法,包括以下步骤:S1:路床施工前期准备工作,先进行对路床的测量和放线以及土工试验,S2:路床修筑及平整,S3:再在S2的基础上对路床进行压实,S4:准备工作,S5:施工放样,S6:将发泡混凝土砌块,均匀层均匀厚度的堆放在路床上,S7:铺设发泡混凝土砌块,S8:定型和碾压,本发明通过将传统用水泥浇筑出来的工程道路替换成用混凝土砌块铺设的道路,在多块区域内的受到损坏时可对当前的块数进行更换,就不用再进行区域内工程道路的铲除再重新进行浇筑和养护,建议大力推广。
Construction method for filling prefabricated building blocks with foaming slurry in road construction
The invention discloses a construction method for filling prefabricated building blocks with foaming slurry in road construction, which comprises the following steps: S1, early-stage preparation work of roadbed construction: firstly carrying out measurement, paying-off and soil test on a roadbed, S2, building and leveling the roadbed, S3, compacting the roadbed on the basis of S2, S4, preparation work, S5, construction lofting, S5, early-stage preparation work of roadbed construction, S5, carrying out early-stage preparation work of roadbed construction, S5, carrying out early-stage preparation work of roadbed construction, and S5, carrying out early-stage preparation work of roadbed construction. The construction method comprises the following steps of S1, arranging a uniform layer on a roadbed, S6, stacking foamed concrete blocks and the uniform layer on the roadbed with the uniform thickness, S7, laying the foamed concrete blocks, and S8, shaping and rolling. A traditional engineering road poured by cement is replaced by a road laid by the concrete blocks, the current block number can be replaced when a plurality of blocks are damaged, and the construction efficiency is improved. Construction roads in the area do not need to be shoveled, and pouring and maintenance do not need to be conducted again, and vigorous popularization is suggested.
本发明公开了一种采用发泡浆体填灌预制砌块在道路施工中的施工方法,包括以下步骤:S1:路床施工前期准备工作,先进行对路床的测量和放线以及土工试验,S2:路床修筑及平整,S3:再在S2的基础上对路床进行压实,S4:准备工作,S5:施工放样,S6:将发泡混凝土砌块,均匀层均匀厚度的堆放在路床上,S7:铺设发泡混凝土砌块,S8:定型和碾压,本发明通过将传统用水泥浇筑出来的工程道路替换成用混凝土砌块铺设的道路,在多块区域内的受到损坏时可对当前的块数进行更换,就不用再进行区域内工程道路的铲除再重新进行浇筑和养护,建议大力推广。
Construction method for filling prefabricated building blocks with foaming slurry in road construction
一种采用发泡浆体填灌预制砌块在道路施工中的施工方法
LIN PINWEI (Autor:in) / CAI TINGKUN (Autor:in) / CHENG KAIQUAN (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2018
FOAMING FILLING ADIABATIC CONSTRUCTION METHOD OF STEEL SHELL BUILDING FRAME
Europäisches Patentamt | 2016
|CONSTRUCTION METHOD OF PREFABRICATED BUILDING AND PREFABRICATED BUILDING
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2022
|