The invention particularly relates to a construction method of a waterproof casing pipe with a rear hole for a roof or basement structural slab. The construction method comprises the following steps: step 1, forming a hole in a roof or basement structural slab through a water drill and other related tools and machines; step 2, after a processed waterproof sleeve is put in the rear hole, conducting first-time formwork hanging construction; step 3.1, conducting a waterproof construction on a roof or basement top slab part; step 3.2, conducting a waterproof construction on a basement wall slab part; step 4, conducting an upper 'steamed bun' construction; and step 5, reinforcing a waterproof coating at the 'steamed bun' part, and flanging to the casing pipe. The method moves a position of a water stop wing ring outwards, reduces the size of the rear hole, has relatively small damage to a structure, and generally does not need to increase a structure reinforcing measure.
本发明具体是屋面或地库结构板的后开洞防水套管施工方法;包括步骤1、利用水钻等相关工机具在屋面或地库结构板取孔;步骤2、将加工好的防水套管放入后开洞,进行第一次吊模施工;步骤3.1、屋面或地库顶板部位防水施工;步骤3.2、地库墙板部位防水施工;步骤4、进行上部“馒头包”施工;步骤5、最后进行“馒头包”部位防水涂层补强,也需翻边至套管上。本方法将止水翼环的位置外移,减小了后开洞尺寸,对结构破坏性较小,一般无需增加结构补强措施。
Construction method of waterproof casing pipe with rear hole for roof or basement structural slab
The invention particularly relates to a construction method of a waterproof casing pipe with a rear hole for a roof or basement structural slab. The construction method comprises the following steps: step 1, forming a hole in a roof or basement structural slab through a water drill and other related tools and machines; step 2, after a processed waterproof sleeve is put in the rear hole, conducting first-time formwork hanging construction; step 3.1, conducting a waterproof construction on a roof or basement top slab part; step 3.2, conducting a waterproof construction on a basement wall slab part; step 4, conducting an upper 'steamed bun' construction; and step 5, reinforcing a waterproof coating at the 'steamed bun' part, and flanging to the casing pipe. The method moves a position of a water stop wing ring outwards, reduces the size of the rear hole, has relatively small damage to a structure, and generally does not need to increase a structure reinforcing measure.
本发明具体是屋面或地库结构板的后开洞防水套管施工方法;包括步骤1、利用水钻等相关工机具在屋面或地库结构板取孔;步骤2、将加工好的防水套管放入后开洞,进行第一次吊模施工;步骤3.1、屋面或地库顶板部位防水施工;步骤3.2、地库墙板部位防水施工;步骤4、进行上部“馒头包”施工;步骤5、最后进行“馒头包”部位防水涂层补强,也需翻边至套管上。本方法将止水翼环的位置外移,减小了后开洞尺寸,对结构破坏性较小,一般无需增加结构补强措施。
Construction method of waterproof casing pipe with rear hole for roof or basement structural slab
屋面或地库结构板的后开洞防水套管施工方法
22.10.2021
Patent
Elektronische Ressource
Chinesisch
Waterproof construction method for roof, basement exterior wall and basement roof
Europäisches Patentamt | 2021
|Basement top slab waterproof structure and construction method thereof
Europäisches Patentamt | 2020
|Waterproof construction process and construction equipment for basement roof
Europäisches Patentamt | 2024
|