Sunken bridgehead transition slab soft foundation reinforcement and transition slab jacking repair system
The invention relates to a subsidence bridgehead transition slab soft foundation reinforcing and transition slab jacking repairing system, and belongs to the technical field of soil squeezing pile repairing, and belongs to the field of soil squeezing pile repairing. The subsidence bridgehead transition slab soft foundation reinforcing and transition slab jacking repairing system comprises a soil squeezing pile, a plurality of discharging pipes are arranged on the peripheral side of the soil squeezing pile, and a plurality of partition plates are fixed in the soil squeezing pile in the vertical direction; a discharging pipe is fixed to the bottom face of the partition plate. A cleaning pipe is slidably connected to the peripheral side of the discharging pipe in the radial direction of the discharging pipe, and the cleaning pipe can be slidably connected with the discharging pipe. The grouting device has the effect that the discharging opening blocked by grouting liquid can be conveniently dredged.
本申请涉及沉陷桥头搭板软弱地基加固及搭板顶升修复系统,属于挤土桩修复的技术领域,属于挤土桩修复的领域,其包括挤土桩,所述挤土桩周侧设置有若干个出料管,所述挤土桩内沿竖向固定有若干个隔板;所述隔板底面固定有下料管;所述下料管周侧沿自身径向滑移连接有清洁管,所述清洁管可与所述出料管滑动连接。本申请具有便于疏通被注浆液堵塞的出料口的效果。
Sunken bridgehead transition slab soft foundation reinforcement and transition slab jacking repair system
The invention relates to a subsidence bridgehead transition slab soft foundation reinforcing and transition slab jacking repairing system, and belongs to the technical field of soil squeezing pile repairing, and belongs to the field of soil squeezing pile repairing. The subsidence bridgehead transition slab soft foundation reinforcing and transition slab jacking repairing system comprises a soil squeezing pile, a plurality of discharging pipes are arranged on the peripheral side of the soil squeezing pile, and a plurality of partition plates are fixed in the soil squeezing pile in the vertical direction; a discharging pipe is fixed to the bottom face of the partition plate. A cleaning pipe is slidably connected to the peripheral side of the discharging pipe in the radial direction of the discharging pipe, and the cleaning pipe can be slidably connected with the discharging pipe. The grouting device has the effect that the discharging opening blocked by grouting liquid can be conveniently dredged.
本申请涉及沉陷桥头搭板软弱地基加固及搭板顶升修复系统,属于挤土桩修复的技术领域,属于挤土桩修复的领域,其包括挤土桩,所述挤土桩周侧设置有若干个出料管,所述挤土桩内沿竖向固定有若干个隔板;所述隔板底面固定有下料管;所述下料管周侧沿自身径向滑移连接有清洁管,所述清洁管可与所述出料管滑动连接。本申请具有便于疏通被注浆液堵塞的出料口的效果。
Sunken bridgehead transition slab soft foundation reinforcement and transition slab jacking repair system
沉陷桥头搭板软弱地基加固及搭板顶升修复系统
GUI CHAIAN (Autor:in)
28.06.2022
Patent
Elektronische Ressource
Chinesisch
Bridgehead transition slab structure for hydraulic engineering
Europäisches Patentamt | 2020
|Grouting construction method for highway reconstruction and extension bridgehead transition slab
Europäisches Patentamt | 2021
|Injected Polyurethane Slab Jacking
NTIS | 2000
Europäisches Patentamt | 2023
|