Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Greening concrete curing device
The invention relates to maintenance equipment, in particular to a greening concrete maintenance device which comprises a barrel, a material storage cavity is formed in the middle of the inner side of the barrel, a water storage cavity is formed in the position, close to the edge, of the inner side of the barrel, a rotating rod is rotationally connected to the middle of the inner side of the material storage cavity, stirring blades are fixedly connected to the rotating rod, and a motor is fixedly connected to the middle of one side of the barrel. A discharging pipe is arranged on one side of the middle of the bottom end of the barrel, one end of the discharging pipe communicates with the interior of the storage cavity, a water drainage pipe is further arranged on one side of the middle of the bottom end of the barrel, and one end of the water drainage pipe communicates with the interior of the water storage cavity. The other end of the drainage pipe is communicated with the middle rear section of the discharging pipe, a second control valve is arranged at the position, close to the barrel, of the discharging pipe, and a first control valve is arranged on the drainage pipe. The greening concrete curing device solves the problems that existing equipment is single in function during bare soil covering or greening, and follow-up water curing needs to be conducted manually.
本发明涉及一种养护设备,具体涉及一种绿化混凝土养护装置,包括筒体,筒体的内侧中部设置有储料腔,筒体的内侧靠近边缘处设置有储水腔,储料腔的内侧中部转动连接有转杆,转杆上固定连接有搅拌叶,筒体的一侧中部固定连接有电机,且电机的转轴贯穿筒体并与转杆的一端固定连接,筒体的底端中部一侧设置有排料管,且排料管的一端与储料腔的内部连通,筒体的底端中部一侧还设置有排水管,且排水管的一端与储水腔的内部连通,排水管的另一端与排料管的中后段连通,排料管的靠近筒体的位置处设置有控制阀二,排水管上设置有控制阀一。本发明绿化混凝土养护装置解决了裸土覆盖或者绿化时现有设备功能单一,后续的水分养护需要人工进行的问题。
Greening concrete curing device
The invention relates to maintenance equipment, in particular to a greening concrete maintenance device which comprises a barrel, a material storage cavity is formed in the middle of the inner side of the barrel, a water storage cavity is formed in the position, close to the edge, of the inner side of the barrel, a rotating rod is rotationally connected to the middle of the inner side of the material storage cavity, stirring blades are fixedly connected to the rotating rod, and a motor is fixedly connected to the middle of one side of the barrel. A discharging pipe is arranged on one side of the middle of the bottom end of the barrel, one end of the discharging pipe communicates with the interior of the storage cavity, a water drainage pipe is further arranged on one side of the middle of the bottom end of the barrel, and one end of the water drainage pipe communicates with the interior of the water storage cavity. The other end of the drainage pipe is communicated with the middle rear section of the discharging pipe, a second control valve is arranged at the position, close to the barrel, of the discharging pipe, and a first control valve is arranged on the drainage pipe. The greening concrete curing device solves the problems that existing equipment is single in function during bare soil covering or greening, and follow-up water curing needs to be conducted manually.
本发明涉及一种养护设备,具体涉及一种绿化混凝土养护装置,包括筒体,筒体的内侧中部设置有储料腔,筒体的内侧靠近边缘处设置有储水腔,储料腔的内侧中部转动连接有转杆,转杆上固定连接有搅拌叶,筒体的一侧中部固定连接有电机,且电机的转轴贯穿筒体并与转杆的一端固定连接,筒体的底端中部一侧设置有排料管,且排料管的一端与储料腔的内部连通,筒体的底端中部一侧还设置有排水管,且排水管的一端与储水腔的内部连通,排水管的另一端与排料管的中后段连通,排料管的靠近筒体的位置处设置有控制阀二,排水管上设置有控制阀一。本发明绿化混凝土养护装置解决了裸土覆盖或者绿化时现有设备功能单一,后续的水分养护需要人工进行的问题。
Greening concrete curing device
一种绿化混凝土养护装置
ZHANG XINLIANG (Autor:in) / SUN JIANPENG (Autor:in) / XIE JIANHAO (Autor:in) / LI PEIHAO (Autor:in) / WANG ZHUO (Autor:in) / WANG LITAO (Autor:in) / XUE YANDONG (Autor:in)
08.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
C04B
Kalk
,
LIME
Planting device and greening method for reinforced concrete seawall greening
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|