Cover plate for sealing post-cast strip in advance and construction method of cover plate
The invention discloses a cover plate for closing a post-cast strip in advance, which comprises a prefabricated concrete plate, the prefabricated concrete plate covers the top plate post-cast strip of a basement, at least two PVC (polyvinyl chloride) pipes are arranged on the concrete plate, and the PVC pipes are communicated with the concrete plate. And the PVC pipe is used as a sprue gate for pouring concrete into the top plate post-cast strip to form the top plate post-cast strip. After the concrete slab structure which is prefabricated and formed in advance is adopted, sealing construction is conducted on the top plate post-cast strip in advance, follow-up construction of the top plate post-cast strip is achieved by reserving the through PVC pipe, and formwork removal of the concrete slab covering the top plate post-cast strip is not needed; and after construction projects such as basement roof backfilling, outdoor pipe network, road and landscape greening are completed in advance, pouring construction of the roof post-pouring belt is achieved.
本发明公开了一种用于后浇带提前封闭的盖板,包括预制成型的混凝土板,将预制成型的混凝土板覆盖在地下室的顶板后浇带上,其中,混凝土板上至少设有两个PVC管,且PVC管与混凝土板之间相贯通连接,PVC管用于作为向顶板后浇带内浇筑混凝土以形成顶板后浇带的浇注口。采用提前预制成型的混凝土板结构后,以实现在顶板后浇带上进行提前封闭施工,通过预留贯通的PVC管实现后续对顶板后浇带的施工,无需对覆盖在顶板后浇带上的混凝土板拆模,待地下室顶板回土、室外管网、道路、景观绿化等工序提前穿插施工项目完成后,以实现对顶板后浇带进行浇筑施工。
Cover plate for sealing post-cast strip in advance and construction method of cover plate
The invention discloses a cover plate for closing a post-cast strip in advance, which comprises a prefabricated concrete plate, the prefabricated concrete plate covers the top plate post-cast strip of a basement, at least two PVC (polyvinyl chloride) pipes are arranged on the concrete plate, and the PVC pipes are communicated with the concrete plate. And the PVC pipe is used as a sprue gate for pouring concrete into the top plate post-cast strip to form the top plate post-cast strip. After the concrete slab structure which is prefabricated and formed in advance is adopted, sealing construction is conducted on the top plate post-cast strip in advance, follow-up construction of the top plate post-cast strip is achieved by reserving the through PVC pipe, and formwork removal of the concrete slab covering the top plate post-cast strip is not needed; and after construction projects such as basement roof backfilling, outdoor pipe network, road and landscape greening are completed in advance, pouring construction of the roof post-pouring belt is achieved.
本发明公开了一种用于后浇带提前封闭的盖板,包括预制成型的混凝土板,将预制成型的混凝土板覆盖在地下室的顶板后浇带上,其中,混凝土板上至少设有两个PVC管,且PVC管与混凝土板之间相贯通连接,PVC管用于作为向顶板后浇带内浇筑混凝土以形成顶板后浇带的浇注口。采用提前预制成型的混凝土板结构后,以实现在顶板后浇带上进行提前封闭施工,通过预留贯通的PVC管实现后续对顶板后浇带的施工,无需对覆盖在顶板后浇带上的混凝土板拆模,待地下室顶板回土、室外管网、道路、景观绿化等工序提前穿插施工项目完成后,以实现对顶板后浇带进行浇筑施工。
Cover plate for sealing post-cast strip in advance and construction method of cover plate
一种用于后浇带提前封闭的盖板及其施工方法
JIA CHUNZE (Autor:in) / ZHENG XUWEI (Autor:in) / QIN KAI (Autor:in) / XIANG XUEQIN (Autor:in) / GAO YIMENG (Autor:in) / YANG LINSONG (Autor:in) / LUO XUN (Autor:in) / YE QICHANG (Autor:in) / LIU LONGSHAN (Autor:in)
29.08.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for sealing post-cast strip in advance
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Construction method for sealing settlement post-cast strip in advance
Europäisches Patentamt | 2021
|Basement bottom plate post-cast strip sealing structure and construction method
Europäisches Patentamt | 2024
|Basement exterior wall post-cast strip steel plate sealing construction method
Europäisches Patentamt | 2024
|