Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device and construction method for bridge closure
The invention discloses a bridge closure construction device which is characterized in that the device comprises a bridge floor crane (1), the bridge floor crane (1) is arranged on a first bridge section (3) and a second bridge section (4) on the two sides of a closure opening (2), and a closure section beam (6) is arranged at the position of the closure opening (2); a pair of locking mechanisms (7) and a pair of interval control mechanisms (8) are arranged between the closure section beam (6) and the first bridge section (3), a pair of locking mechanisms (7) and a pair of interval control mechanisms (8) are arranged between the closure section beam (6) and the second bridge section (4), and walking type pushing devices (9) are further arranged on the bottom end face of the first bridge section (3) and the bottom end face of the second bridge section (4). Meanwhile, the invention further discloses a method for conducting bridge closure construction through the device.
本发明公开一种桥梁合龙的施工装置,其特征在于:所述的装置包括桥面吊机(1),所述桥面吊机(1)设置在合龙口(2)两侧的第一桥梁段(3)和第二桥梁段(4)上,所述合龙口(2)处设置有合龙段梁(6),所述合龙段梁(6)和第一桥梁段(3)之间、以及合龙段梁(6)和第二桥梁段(4)之间均设置有一对锁定机构(7)和一对间隔控制机构(8),而在第一桥梁段(3)和第二桥梁段(4)的底端面上还均设置有步履式顶推器(9)。同时还公开了一种利用上述装置进行桥梁合龙施工的方法。
Construction device and construction method for bridge closure
The invention discloses a bridge closure construction device which is characterized in that the device comprises a bridge floor crane (1), the bridge floor crane (1) is arranged on a first bridge section (3) and a second bridge section (4) on the two sides of a closure opening (2), and a closure section beam (6) is arranged at the position of the closure opening (2); a pair of locking mechanisms (7) and a pair of interval control mechanisms (8) are arranged between the closure section beam (6) and the first bridge section (3), a pair of locking mechanisms (7) and a pair of interval control mechanisms (8) are arranged between the closure section beam (6) and the second bridge section (4), and walking type pushing devices (9) are further arranged on the bottom end face of the first bridge section (3) and the bottom end face of the second bridge section (4). Meanwhile, the invention further discloses a method for conducting bridge closure construction through the device.
本发明公开一种桥梁合龙的施工装置,其特征在于:所述的装置包括桥面吊机(1),所述桥面吊机(1)设置在合龙口(2)两侧的第一桥梁段(3)和第二桥梁段(4)上,所述合龙口(2)处设置有合龙段梁(6),所述合龙段梁(6)和第一桥梁段(3)之间、以及合龙段梁(6)和第二桥梁段(4)之间均设置有一对锁定机构(7)和一对间隔控制机构(8),而在第一桥梁段(3)和第二桥梁段(4)的底端面上还均设置有步履式顶推器(9)。同时还公开了一种利用上述装置进行桥梁合龙施工的方法。
Construction device and construction method for bridge closure
一种桥梁合龙的施工装置及施工方法
WANG SEN (Autor:in) / CAO YUEHUA (Autor:in) / TENG YUNLONG (Autor:in) / DING ZHEZHEN (Autor:in) / JIANG ZONGHENG (Autor:in) / CHEN HUAIGENG (Autor:in) / FU XIANXUE (Autor:in) / LEI JUNCHAO (Autor:in) / WANG JING (Autor:in) / ZENG JUNYUAN (Autor:in)
02.01.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Swivel bridge closure device and swivel bridge closure construction method
Europäisches Patentamt | 2020
|