Sedimentation post-cast strip pre-sealing structure and construction method thereof
The invention discloses a settlement post-cast strip pre-sealing structure and a construction method thereof, and belongs to the technical field of post-cast strips, the settlement post-cast strip pre-sealing structure comprises turnups poured on the two sides of a settlement post-cast strip, the turnups are covered with a plurality of cover plates, penetrating grooves are formed in the cover plates, and inserting pipes are fixedly connected to the inner walls of the penetrating grooves; each cover plate is provided with a plurality of groups of sealing mechanisms for sealing the inserting pipes; a plurality of through grooves are formed in the inserting pipe, a plurality of sliding blocks are fixedly connected to the portion, inserted into the inserting pipe, of the pouring pipe, and the sliding blocks correspond to the through grooves in a one-to-one mode. The construction method of the settlement post-cast strip pre-sealing structure comprises the following steps that turnups are poured on the two sides of a settlement post-cast strip; a plurality of cover plates are sequentially placed on the turned-over edges, and the adjacent cover plates are tightly connected; and after the settlement of the main building is stabilized, a pouring pipeline is inserted into the inserting pipe, and concrete is poured into the settlement post-pouring belt. The device has the effect of improving the pouring efficiency of the settlement post-cast strip.
本申请公开了沉降后浇带预封闭结构及其施工方法,属于后浇带技术领域,沉降后浇带预封闭结构,包括浇筑于沉降后浇带两侧的翻边,翻边上盖设有多个盖板,盖板上开设有穿过槽,穿过槽的内壁上固定连接有插接管,每个盖板上均设置有多组用于密封插接管的密封机构;插接管上开设有多个通槽,插接于插接管内的浇筑管上固定连接有多个滑动块,滑动块与通槽一一对应。沉降后浇带预封闭结构的施工方法,包括以下步骤:在沉降后浇带的两侧浇筑翻边;将多个盖板依次放置于翻边上,使相邻盖板之间紧密连接;在主楼沉降稳定在之后,将浇筑管道插入插接管内,将混凝土浇筑于沉降后浇带内。本申请具有提高对沉降后浇带浇筑效率的效果。
Sedimentation post-cast strip pre-sealing structure and construction method thereof
The invention discloses a settlement post-cast strip pre-sealing structure and a construction method thereof, and belongs to the technical field of post-cast strips, the settlement post-cast strip pre-sealing structure comprises turnups poured on the two sides of a settlement post-cast strip, the turnups are covered with a plurality of cover plates, penetrating grooves are formed in the cover plates, and inserting pipes are fixedly connected to the inner walls of the penetrating grooves; each cover plate is provided with a plurality of groups of sealing mechanisms for sealing the inserting pipes; a plurality of through grooves are formed in the inserting pipe, a plurality of sliding blocks are fixedly connected to the portion, inserted into the inserting pipe, of the pouring pipe, and the sliding blocks correspond to the through grooves in a one-to-one mode. The construction method of the settlement post-cast strip pre-sealing structure comprises the following steps that turnups are poured on the two sides of a settlement post-cast strip; a plurality of cover plates are sequentially placed on the turned-over edges, and the adjacent cover plates are tightly connected; and after the settlement of the main building is stabilized, a pouring pipeline is inserted into the inserting pipe, and concrete is poured into the settlement post-pouring belt. The device has the effect of improving the pouring efficiency of the settlement post-cast strip.
本申请公开了沉降后浇带预封闭结构及其施工方法,属于后浇带技术领域,沉降后浇带预封闭结构,包括浇筑于沉降后浇带两侧的翻边,翻边上盖设有多个盖板,盖板上开设有穿过槽,穿过槽的内壁上固定连接有插接管,每个盖板上均设置有多组用于密封插接管的密封机构;插接管上开设有多个通槽,插接于插接管内的浇筑管上固定连接有多个滑动块,滑动块与通槽一一对应。沉降后浇带预封闭结构的施工方法,包括以下步骤:在沉降后浇带的两侧浇筑翻边;将多个盖板依次放置于翻边上,使相邻盖板之间紧密连接;在主楼沉降稳定在之后,将浇筑管道插入插接管内,将混凝土浇筑于沉降后浇带内。本申请具有提高对沉降后浇带浇筑效率的效果。
Sedimentation post-cast strip pre-sealing structure and construction method thereof
沉降后浇带预封闭结构及其施工方法
JIANG JIANBO (Autor:in) / JI PEICHUN (Autor:in) / LI YUANTING (Autor:in) / YU XIAOFENG (Autor:in) / HU JIANYONG (Autor:in) / SONG LONGLONG (Autor:in) / BO QICHEN (Autor:in) / ZHOU JIE (Autor:in) / CHEN HONGYAN (Autor:in)
08.03.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Sedimentation post-cast strip sealing construction method
Europäisches Patentamt | 2023
|Sedimentation post-cast strip pre-sealing structure and construction method thereof
Europäisches Patentamt | 2024
|Laminated slab post-cast strip sealing construction method and sealing structure
Europäisches Patentamt | 2022
|