Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device and construction method for rail top air duct of assembled and overlapped integral type underground station
The invention discloses a construction device and a construction method of an assembled and superposed integral type underground station rail top air duct, which are characterized in that a worker can be lifted to a construction area of an air duct side wall through the lifting height of a lifting platform, the worker can conveniently perform construction operation, and the lifting platform is lifted, and the torsion of a torsion spring is released at the moment; the torsional spring drives the rotating shaft and the plate frame to rotate through the gear, the plate frame is turned over to be away from the hanging basket, at the moment, the plate frame can unfold the mesh belt to increase the area, the mesh belt is located below a construction area, and when workers install a triangular support and an air duct side wall through installation bolts, the installation bolts fall off mistakenly, and at the moment, the mesh belt can receive the installation bolts. And secondly, the installation bolts can enter the storage box from the lower portion of the mesh belt through the discharging opening, so that the installation bolts are conveniently picked up by workers, and the situation that the installation operation is affected due to the fact that the bolts are lost is avoided.
本发明公开了装配叠合整体式地下车站轨顶风道施工装置及其施工方法,包括通过升降平台上升高度,则可将工作人员提升到风道侧墙的施工区域,方便工作人员进行施工作业,而且升降平台上升,此时扭簧的扭力释放,使扭簧通过齿轮带动转轴和板框旋转,使板框翻转远离吊篮,此时板框即可将网带展开增大面积,使网带位于施工区域下方,在工作人员通过安装螺栓安装三角架和风道侧墙时,导致安装螺栓误掉落,此时网带即可接取安装螺栓,从而避免安装螺栓向下掉落伤害下方人员,其次,安装螺栓从网带的下方可通过排出口进入储物盒中,从而便于工作人员拾取,避免螺栓丢失影响安装作业。
Construction device and construction method for rail top air duct of assembled and overlapped integral type underground station
The invention discloses a construction device and a construction method of an assembled and superposed integral type underground station rail top air duct, which are characterized in that a worker can be lifted to a construction area of an air duct side wall through the lifting height of a lifting platform, the worker can conveniently perform construction operation, and the lifting platform is lifted, and the torsion of a torsion spring is released at the moment; the torsional spring drives the rotating shaft and the plate frame to rotate through the gear, the plate frame is turned over to be away from the hanging basket, at the moment, the plate frame can unfold the mesh belt to increase the area, the mesh belt is located below a construction area, and when workers install a triangular support and an air duct side wall through installation bolts, the installation bolts fall off mistakenly, and at the moment, the mesh belt can receive the installation bolts. And secondly, the installation bolts can enter the storage box from the lower portion of the mesh belt through the discharging opening, so that the installation bolts are conveniently picked up by workers, and the situation that the installation operation is affected due to the fact that the bolts are lost is avoided.
本发明公开了装配叠合整体式地下车站轨顶风道施工装置及其施工方法,包括通过升降平台上升高度,则可将工作人员提升到风道侧墙的施工区域,方便工作人员进行施工作业,而且升降平台上升,此时扭簧的扭力释放,使扭簧通过齿轮带动转轴和板框旋转,使板框翻转远离吊篮,此时板框即可将网带展开增大面积,使网带位于施工区域下方,在工作人员通过安装螺栓安装三角架和风道侧墙时,导致安装螺栓误掉落,此时网带即可接取安装螺栓,从而避免安装螺栓向下掉落伤害下方人员,其次,安装螺栓从网带的下方可通过排出口进入储物盒中,从而便于工作人员拾取,避免螺栓丢失影响安装作业。
Construction device and construction method for rail top air duct of assembled and overlapped integral type underground station
装配叠合整体式地下车站轨顶风道施工装置及其施工方法
KANG PENGCHENG (Autor:in) / CUI GANG (Autor:in) / XIE ZHONGWEN (Autor:in) / CHEN PENG (Autor:in) / ZHAO XINWEN (Autor:in) / DENG LIN (Autor:in) / YAO FENG (Autor:in) / YUAN HUAN (Autor:in)
16.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B25H
Werkstatteinrichtungen, z.B. zum Anreißen von Werkstücken
,
WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Assembled and overlapped integral type underground station platform plate and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Assembled integral type underground structure and construction method
Europäisches Patentamt | 2024
|Assembling method for overlapped assembly type underground station
Europäisches Patentamt | 2023
|