Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cement plug plugging method under oil-based drilling fluid condition and cement paste
The invention discloses a cement plug plugging method under an oil-based drilling fluid condition and cement paste, and the method comprises the following steps: a drilling tool is put down to a well bottom or a leakage layer, and a pre-positioned spacer fluid is pumped at a first preset pumping displacement; cement paste is pumped with the second preset pump injection displacement; if the front spacer fluid flows out of the water hole of the drilling tool and starts to return upwards by a first preset height, drilling is conducted by one stand column height without stopping the pump; pumping the rear spacer fluid at a third preset pumping displacement; the drilling tool is kept immobile, and the drilling fluid is pumped with the fourth preset pumping displacement; judging whether the preposed spacer fluid flows out of the water hole of the drilling tool and begins to upwards return to the annulus or not; if yes, after the front spacer fluid upwards returns to the first preset height, the drill is pulled out by the height of one stand column without stopping the pump; if not, pulling out the hole to a second preset height above the cement surface; well closing and squeezing injection are conducted, and spacer fluid arranged in front of the bottom of the cement paste and cement paste with the sixth preset volume are squeezed into the leakage stratum; and according to the determined initial setting time of the cement paste, well shut-in squeezing injection is conducted with the preset squeezing injection displacement, and the total squeezing injection amount of the cement paste is determined.
本发明公开油基钻井液条件下打水泥塞堵漏方法及水泥浆,该方法包括将钻具下至井底或漏层处,以第一预设泵注排量泵注前置的隔离液;以第二预设泵注排量泵注水泥浆;若前置的隔离液出钻具水眼开始上返第一预设高度,不停泵起钻一个立柱高度;以第三预设泵注排量泵注后置的隔离液;保持钻具不动,以第四预设泵注排量泵注钻井液;判断前置的隔离液是否会出钻具水眼开始上返环空;若是,在前置的隔离液上返第一预设高度后,不停泵起钻一个立柱高度;若否,起钻至水泥面以上第二预设高度;关井挤注,将水泥浆底部的垫底前置的隔离液及第六预设体积的水泥浆挤入漏失地层;根据确定的水泥浆的初凝时间,以预设挤注排量进行关井挤注,确定水泥浆总挤注量。
Cement plug plugging method under oil-based drilling fluid condition and cement paste
The invention discloses a cement plug plugging method under an oil-based drilling fluid condition and cement paste, and the method comprises the following steps: a drilling tool is put down to a well bottom or a leakage layer, and a pre-positioned spacer fluid is pumped at a first preset pumping displacement; cement paste is pumped with the second preset pump injection displacement; if the front spacer fluid flows out of the water hole of the drilling tool and starts to return upwards by a first preset height, drilling is conducted by one stand column height without stopping the pump; pumping the rear spacer fluid at a third preset pumping displacement; the drilling tool is kept immobile, and the drilling fluid is pumped with the fourth preset pumping displacement; judging whether the preposed spacer fluid flows out of the water hole of the drilling tool and begins to upwards return to the annulus or not; if yes, after the front spacer fluid upwards returns to the first preset height, the drill is pulled out by the height of one stand column without stopping the pump; if not, pulling out the hole to a second preset height above the cement surface; well closing and squeezing injection are conducted, and spacer fluid arranged in front of the bottom of the cement paste and cement paste with the sixth preset volume are squeezed into the leakage stratum; and according to the determined initial setting time of the cement paste, well shut-in squeezing injection is conducted with the preset squeezing injection displacement, and the total squeezing injection amount of the cement paste is determined.
本发明公开油基钻井液条件下打水泥塞堵漏方法及水泥浆,该方法包括将钻具下至井底或漏层处,以第一预设泵注排量泵注前置的隔离液;以第二预设泵注排量泵注水泥浆;若前置的隔离液出钻具水眼开始上返第一预设高度,不停泵起钻一个立柱高度;以第三预设泵注排量泵注后置的隔离液;保持钻具不动,以第四预设泵注排量泵注钻井液;判断前置的隔离液是否会出钻具水眼开始上返环空;若是,在前置的隔离液上返第一预设高度后,不停泵起钻一个立柱高度;若否,起钻至水泥面以上第二预设高度;关井挤注,将水泥浆底部的垫底前置的隔离液及第六预设体积的水泥浆挤入漏失地层;根据确定的水泥浆的初凝时间,以预设挤注排量进行关井挤注,确定水泥浆总挤注量。
Cement plug plugging method under oil-based drilling fluid condition and cement paste
一种油基钻井液条件下打水泥塞堵漏方法及水泥浆
SUN YILIU (Autor:in) / ZHOU FENG (Autor:in) / LI CHENGQUAN (Autor:in) / DENG TIAN'AN (Autor:in) / ZHANG HUA (Autor:in) / ZHANG CHAOPING (Autor:in) / ZHANG SHUNPING (Autor:in) / YU ZHAOCAI (Autor:in) / XU WENHUA (Autor:in) / LIU BO (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
Oil-based drilling fluid plugging cement paste and application thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Self-anti-pollution cement paste for well cementation under oil-based drilling fluid condition
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|