Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
REINFORCEMENT ARRANGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a technique in a reinforcement arrangement method for assembling reinforcements in a predetermined state above a form, capable of improving workability, and meanwhile, suppressing occurrence of noise associated with mounting of the reinforcements on the form.SOLUTION: A reinforcement arrangement method includes: a first step of arranging expanded tubes 5a on the upper surface of a form 2, and disposing reinforcements 21 above the form in a state of being mounted on the upper surface of the expanded tubes 5a; a second step of assembling the disposed reinforcements 21 in a predetermined state above the form 2, and meanwhile, shrinking the tubes 5; and a third step of collecting the shrunk tubes 5 through a gap between the assembled reinforcements 21 and the form 2.SELECTED DRAWING: Figure 2
【課題】型枠の上方で鉄筋を所定状態に組み立てる配筋方法において、作業性を向上させながら型枠上への鉄筋載置に伴う騒音の発生を抑制することができる技術を提供する。【解決手段】型枠2の上面に膨らませたチューブ5aを配置し、このチューブ5aの上面に載置する状態で型枠の上方に鉄筋21を配る第1ステップと、配られた鉄筋21を型枠2の上方で所定状態に組み立てると共に、チューブ5を萎ませる第2ステップと、萎ませたチューブ5を組み立てた鉄筋21と型枠2の間の隙間を通して回収する第3ステップを備える。【選択図】図2
REINFORCEMENT ARRANGEMENT METHOD
PROBLEM TO BE SOLVED: To provide a technique in a reinforcement arrangement method for assembling reinforcements in a predetermined state above a form, capable of improving workability, and meanwhile, suppressing occurrence of noise associated with mounting of the reinforcements on the form.SOLUTION: A reinforcement arrangement method includes: a first step of arranging expanded tubes 5a on the upper surface of a form 2, and disposing reinforcements 21 above the form in a state of being mounted on the upper surface of the expanded tubes 5a; a second step of assembling the disposed reinforcements 21 in a predetermined state above the form 2, and meanwhile, shrinking the tubes 5; and a third step of collecting the shrunk tubes 5 through a gap between the assembled reinforcements 21 and the form 2.SELECTED DRAWING: Figure 2
【課題】型枠の上方で鉄筋を所定状態に組み立てる配筋方法において、作業性を向上させながら型枠上への鉄筋載置に伴う騒音の発生を抑制することができる技術を提供する。【解決手段】型枠2の上面に膨らませたチューブ5aを配置し、このチューブ5aの上面に載置する状態で型枠の上方に鉄筋21を配る第1ステップと、配られた鉄筋21を型枠2の上方で所定状態に組み立てると共に、チューブ5を萎ませる第2ステップと、萎ませたチューブ5を組み立てた鉄筋21と型枠2の間の隙間を通して回収する第3ステップを備える。【選択図】図2
REINFORCEMENT ARRANGEMENT METHOD
配筋方法
IMOTO MASATO (Autor:in) / ETO IZUMI (Autor:in) / OGATA MASANORI (Autor:in) / TORIGOE GEN (Autor:in) / YAMASHITA HIDEYUKI (Autor:in)
12.05.2016
Patent
Elektronische Ressource
Japanisch
REINFORCEMENT ARRANGEMENT INSPECTION SYSTEM AND REINFORCEMENT ARRANGEMENT INSPECTION METHOD
Europäisches Patentamt | 2018
|REINFORCEMENT ARRANGEMENT MEMBER AND REINFORCEMENT ARRANGEMENT STRUCTURE
Europäisches Patentamt | 2016
|BEAM REINFORCEMENT AND REINFORCEMENT ARRANGEMENT METHOD
Europäisches Patentamt | 2021
|REINFORCEMENT, AND REINFORCEMENT ARRANGEMENT INSPECTION METHOD
Europäisches Patentamt | 2019
|