RENEWAL METHOD FOR EXISTING ROAD, AND RENEWED ROAD
PROBLEM TO BE SOLVED: To provide a renewal method for an existing road that curtails a period needed for the renewal work of the existing road, along with a road renewed by the renewal method.SOLUTION: A renewal method for an existing road is for renewing an existing road 10 having a reinforced concrete floor slab 2 installed on two or more steel main girders 1. The renewal method for an existing road includes: a first step in which only a portion 4 of the floor slab 2 lying on the main girder is left as is, and the other portions are removed; and a second step in which a new floor slab block 6 having two or more recesses 6a on an undersurface is installed such that each of the recesses 6a is placed on the portion 4 on the two or more main girders, and the installation process of the floor slab block 6 is repeated in a direction of extension of the road, for constructing a renewed road 20.SELECTED DRAWING: Figure 4
【課題】既設道路の更新施工に要する工期の短縮を図ることのできる既設道路の更新施工方法と、この更新施工方法で更新施工された道路を提供すること。【解決手段】二以上の鋼製の主桁1上に鉄筋コンクリート製の床版2が設置されてなる既設道路10の更新方法であって、床版2のうち、主桁上の部分4のみを残置し、他の部分を撤去する第一のステップ、下面に二以上の凹部6aを備えた新設の床版ブロック6を、それぞれの凹部6aが二以上の主桁上の部分4に嵌るようにして設置し、この床版ブロック6の設置を道路の延伸方向に繰り返して更新施工された道路20を施工する第二のステップからなる、既設道路の更新施工方法である。【選択図】図4
RENEWAL METHOD FOR EXISTING ROAD, AND RENEWED ROAD
PROBLEM TO BE SOLVED: To provide a renewal method for an existing road that curtails a period needed for the renewal work of the existing road, along with a road renewed by the renewal method.SOLUTION: A renewal method for an existing road is for renewing an existing road 10 having a reinforced concrete floor slab 2 installed on two or more steel main girders 1. The renewal method for an existing road includes: a first step in which only a portion 4 of the floor slab 2 lying on the main girder is left as is, and the other portions are removed; and a second step in which a new floor slab block 6 having two or more recesses 6a on an undersurface is installed such that each of the recesses 6a is placed on the portion 4 on the two or more main girders, and the installation process of the floor slab block 6 is repeated in a direction of extension of the road, for constructing a renewed road 20.SELECTED DRAWING: Figure 4
【課題】既設道路の更新施工に要する工期の短縮を図ることのできる既設道路の更新施工方法と、この更新施工方法で更新施工された道路を提供すること。【解決手段】二以上の鋼製の主桁1上に鉄筋コンクリート製の床版2が設置されてなる既設道路10の更新方法であって、床版2のうち、主桁上の部分4のみを残置し、他の部分を撤去する第一のステップ、下面に二以上の凹部6aを備えた新設の床版ブロック6を、それぞれの凹部6aが二以上の主桁上の部分4に嵌るようにして設置し、この床版ブロック6の設置を道路の延伸方向に繰り返して更新施工された道路20を施工する第二のステップからなる、既設道路の更新施工方法である。【選択図】図4
RENEWAL METHOD FOR EXISTING ROAD, AND RENEWED ROAD
既設道路の更新施工方法と更新施工された道路
SAKURAI NOBUAKI (Autor:in) / OTAKE ATSURO (Autor:in)
16.03.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Existing road transverse construction and road recovery method
Europäisches Patentamt | 2022
|Renewed interest in use of cast asphalt in road construction
Engineering Index Backfile | 1954
|Beyond Zero – Nordic Architecture on the Road Towards Renewed Practices
BASE | 2025
|Excavation construction method for high road cutting beside existing road
Europäisches Patentamt | 2020
|