Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
DRAIN PILE, DRAIN PILE CONSTRUCTION DEVICE AND CONSTRUCTION METHOD OF DRAIN PILE
To provide an easily placeable drain pile by reducing friction force between the drain pile and the ground when the drain pile is placed, a drain pile construction device and a construction method of the drain pile.SOLUTION: A drain pile 1 is buried around an electric pole and capable of discharging ground water to the outside, and has an outer pipe 10 having an outer peripheral wall 11 having no hole, and an inner pipe 20 storable inside the outer pipe 10 and having a base part 21A formed with multiple water-passing holes HW for passing the ground water. The inner pipe 20 can be moved to a first state with the base part 21A arranged within the outer pipe 10 and to a second state with the base part 21A protruded downward from a lower end of the outer pipe 10. In the first state, the multiple water-passing holes HW are covered with the outer pipe 10.SELECTED DRAWING: Figure 1
【課題】ドレーン杭を打ち込む際におけるドレーン杭と地盤との摩擦力を小さくして、打込作業を容易にするドレーン杭、及びドレーン杭施工装置、並びにドレーン杭の施工方法を提供する。【解決手段】ドレーン杭1は、電柱周りに埋設され、地盤の水を外部に排出可能なドレーン杭1であって、孔のない外周壁11を有する外管10と、外管10内に収容可能であり、地盤の水を通すための複数の通水孔HWが形成されたベース部21Aを有する内管20を備える。内管20は、ベース部21Aが外管10内に配置された第1状態と、ベース部21Aが外管10の下端から下方に突出した第2状態とに移動可能であり、第1状態において、複数の通水孔HWが外管10によって覆われている。【選択図】図1
DRAIN PILE, DRAIN PILE CONSTRUCTION DEVICE AND CONSTRUCTION METHOD OF DRAIN PILE
To provide an easily placeable drain pile by reducing friction force between the drain pile and the ground when the drain pile is placed, a drain pile construction device and a construction method of the drain pile.SOLUTION: A drain pile 1 is buried around an electric pole and capable of discharging ground water to the outside, and has an outer pipe 10 having an outer peripheral wall 11 having no hole, and an inner pipe 20 storable inside the outer pipe 10 and having a base part 21A formed with multiple water-passing holes HW for passing the ground water. The inner pipe 20 can be moved to a first state with the base part 21A arranged within the outer pipe 10 and to a second state with the base part 21A protruded downward from a lower end of the outer pipe 10. In the first state, the multiple water-passing holes HW are covered with the outer pipe 10.SELECTED DRAWING: Figure 1
【課題】ドレーン杭を打ち込む際におけるドレーン杭と地盤との摩擦力を小さくして、打込作業を容易にするドレーン杭、及びドレーン杭施工装置、並びにドレーン杭の施工方法を提供する。【解決手段】ドレーン杭1は、電柱周りに埋設され、地盤の水を外部に排出可能なドレーン杭1であって、孔のない外周壁11を有する外管10と、外管10内に収容可能であり、地盤の水を通すための複数の通水孔HWが形成されたベース部21Aを有する内管20を備える。内管20は、ベース部21Aが外管10内に配置された第1状態と、ベース部21Aが外管10の下端から下方に突出した第2状態とに移動可能であり、第1状態において、複数の通水孔HWが外管10によって覆われている。【選択図】図1
DRAIN PILE, DRAIN PILE CONSTRUCTION DEVICE AND CONSTRUCTION METHOD OF DRAIN PILE
ドレーン杭、ドレーン杭施工装置およびドレーン杭の施工方法
KANNO NORIHIRO (Autor:in) / FUKUBA SHINYA (Autor:in) / SUZUKI NAOTO (Autor:in) / IMAI YUSUKE (Autor:in)
20.05.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ROOF DRAIN, ROOF DRAIN CONSTRUCTION JIG, AND ROOF DRAIN CONSTRUCTION METHOD
Europäisches Patentamt | 2022
|Liquefaction countermeasure using steel sheet pile with drain capability
Tema Archiv | 1996
|Europäisches Patentamt | 2024
|