METHOD FOR TAMPING A TRACK BY MEANS OF ASYNCHRONOUSLY MOVED TAMPING UNITS
For tamping two adjacent sleepers (9) of a track (3), the joint lowering of two adjoining tamping units (2) takes place with a time delay. As a result, the immersion in particular of immediately adjacent inner tamping tines (20) plunging into a common sleeper crib (18) is facilitated.
METHOD FOR TAMPING A TRACK BY MEANS OF ASYNCHRONOUSLY MOVED TAMPING UNITS
For tamping two adjacent sleepers (9) of a track (3), the joint lowering of two adjoining tamping units (2) takes place with a time delay. As a result, the immersion in particular of immediately adjacent inner tamping tines (20) plunging into a common sleeper crib (18) is facilitated.
METHOD FOR TAMPING A TRACK BY MEANS OF ASYNCHRONOUSLY MOVED TAMPING UNITS
SPRINGER HEINZ (Autor:in)
20.08.2015
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Method for tamping a track by means of asynchronously moved tamping units
Europäisches Patentamt | 2017
|Method for underfilling a track by means of asynchronously moved tamping units
Europäisches Patentamt | 2015
|