A platform for research: civil engineering, architecture and urbanism
Small-diameter automatic shield tunnel cast-in-place lining method realizes long-distance tunnel construction - Development of ACE MOLE 1200-M2 construction method
Small-diameter automatic shield tunnel cast-in-place lining method realizes long-distance tunnel construction - Development of ACE MOLE 1200-M2 construction method
Small-diameter automatic shield tunnel cast-in-place lining method realizes long-distance tunnel construction - Development of ACE MOLE 1200-M2 construction method
Kimura, Y. (author) / Saito, T. (author) / Abdel Salam, M. E. / International Tunnelling Association
International congress, Tunnelling and ground conditions ; 1994 ; Cairo
Tunnelling and ground conditions ; 377-384
1994-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1994
|Stress Analysis of Large-diameter Undersea Shield Tunnel Lining Segments during Construction Process
DOAJ | 2024
|European Patent Office | 2022
|