A platform for research: civil engineering, architecture and urbanism
Third TVA dam under way at pickwick landing
Features of Tennessee Valley Authority dam on Tennessee River consisting of hydraulic fill section about 50 ft high, plus concrete-gravity spillway section, about 43 ft high, surmounted with twenty-four 40 by 40 ft gates, total length 7667 ft; dam site conditions; stream flow at site; embankment design; concreting plants.
Third TVA dam under way at pickwick landing
Features of Tennessee Valley Authority dam on Tennessee River consisting of hydraulic fill section about 50 ft high, plus concrete-gravity spillway section, about 43 ft high, surmounted with twenty-four 40 by 40 ft gates, total length 7667 ft; dam site conditions; stream flow at site; embankment design; concreting plants.
Third TVA dam under way at pickwick landing
Eng News-Rec
Engineering News-Record ; 115
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1941
Proposed New Lock Pickwick Landing Dam
NTIS | 1972
Spillway gates at pickwick landing dam
Engineering Index Backfile | 1938
Cableway handles concrete at Pickwick Landing dam
Engineering Index Backfile | 1937
Pickwick Landing Dam South Embankment Seismic Upgrade Project
TIBKAT | 2021
|