A platform for research: civil engineering, architecture and urbanism
Method of topping out Germantown hydraulic fill dam
Upper layers of dam were constructed from mixture of all borrow pit materials deposited in narrow center pool by hydraulic method.
Method of topping out Germantown hydraulic fill dam
Upper layers of dam were constructed from mixture of all borrow pit materials deposited in narrow center pool by hydraulic method.
Method of topping out Germantown hydraulic fill dam
Eng. Contracting
1921
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Germantown, Wisconsin: Comprehensive Plan
NTIS | 1969
Core materials at the Germantown Dam
Engineering Index Backfile | 1930
|A picturesque spot at the Germantown Cricket Club
DataCite | 1910
|