A platform for research: civil engineering, architecture and urbanism
Results of investigation of core of seven-year-old hydraulic fill of Miami Conservancy District; Goldbeck pressure cells were installed to determine horizontal and vertical pressures of core material; comparative results from cells in Germantown, Taylorsville and Tieton (Wash.) dams; direct examination; analysis of core material; sampling methods and tools; sinking driven well.
Results of investigation of core of seven-year-old hydraulic fill of Miami Conservancy District; Goldbeck pressure cells were installed to determine horizontal and vertical pressures of core material; comparative results from cells in Germantown, Taylorsville and Tieton (Wash.) dams; direct examination; analysis of core material; sampling methods and tools; sinking driven well.
Core materials at the Germantown Dam
Eng News-Rec
Eiffert, C.H. (author)
Engineering News-Record ; 105
1930
5 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Germantown, Wisconsin: Comprehensive Plan
NTIS | 1969
Method of topping out Germantown hydraulic fill dam
Engineering Index Backfile | 1921
A picturesque spot at the Germantown Cricket Club
DataCite | 1910
|