A platform for research: civil engineering, architecture and urbanism
Completing Germantown dam
Top of 798,000-yd. hydraulic fill 110 ft. high placed by special method. Outlet conduits reduced to permanent cross sections. Spilway and paving finished and 20,000 yd. of concrete placed in appurtenances.
Completing Germantown dam
Top of 798,000-yd. hydraulic fill 110 ft. high placed by special method. Outlet conduits reduced to permanent cross sections. Spilway and paving finished and 20,000 yd. of concrete placed in appurtenances.
Completing Germantown dam
Public Works
Public Works ; 50
1921
5 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Germantown, Wisconsin: Comprehensive Plan
NTIS | 1969
Method of topping out Germantown hydraulic fill dam
Engineering Index Backfile | 1921
Core materials at the Germantown Dam
Engineering Index Backfile | 1930
|A picturesque spot at the Germantown Cricket Club
DataCite | 1910
|