A platform for research: civil engineering, architecture and urbanism
Speeding settlement of fill over muck by use of explosives
Use of subsurface blasting for rapid settling of highway embankment fills to firm bearings in marshy locations.
Speeding settlement of fill over muck by use of explosives
Use of subsurface blasting for rapid settling of highway embankment fills to firm bearings in marshy locations.
Speeding settlement of fill over muck by use of explosives
Contractors Engrs. Monthly
1931
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Accelerating fill settlement with explosives
Engineering Index Backfile | 1930
|Muck dredged out, solid fill pumped
Engineering Index Backfile | 1941
|Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Stabilization by drainage of Muck and Sand Fill
Engineering Index Backfile | 1932
|