A platform for research: civil engineering, architecture and urbanism
Hydraulic levee building on lower Mississippi
Method of construction consisted of cutting in 55-ft. banquette with a Bucyrus-type 9 1/2 dragline provided with 1 1/4-yd. bucket and 48-ft. boom, and constructing retaining levee parallel to and approximately 75 ft. from old levee.
Hydraulic levee building on lower Mississippi
Method of construction consisted of cutting in 55-ft. banquette with a Bucyrus-type 9 1/2 dragline provided with 1 1/4-yd. bucket and 48-ft. boom, and constructing retaining levee parallel to and approximately 75 ft. from old levee.
Hydraulic levee building on lower Mississippi
Mfrs. Rec
Kelton, E.C. (author)
1929
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Levee building with hydraulic dredges on the Mississippi
Engineering Index Backfile | 1930
|Hydraulic-fill levee construction on the Mississippi
Engineering Index Backfile | 1930
|Levee building by hydraulic dredge
Engineering Index Backfile | 1929
Levee construction along the Mississippi River
Engineering Index Backfile | 1929
|1993 Mississippi Record Stages and Levee Failures
British Library Conference Proceedings | 1994
|