A platform for research: civil engineering, architecture and urbanism
Yellowtail dam contractor shoots for November diversion
Dam is being constructed 45 mi southwest of Hardin, Mont; design calls for concrete arch structure 520 ft high above foundation and 1450 ft long at crest; powerhouse will generate 200,000 kw with 4 Francis-type turbines; construction schedule involves tunnel work for arch dam, with total of 7 tunnels being bored for various purposes such as construction of spillway tunnel, diversion tunnel, and other tunnels.
Yellowtail dam contractor shoots for November diversion
Dam is being constructed 45 mi southwest of Hardin, Mont; design calls for concrete arch structure 520 ft high above foundation and 1450 ft long at crest; powerhouse will generate 200,000 kw with 4 Francis-type turbines; construction schedule involves tunnel work for arch dam, with total of 7 tunnels being bored for various purposes such as construction of spillway tunnel, diversion tunnel, and other tunnels.
Yellowtail dam contractor shoots for November diversion
Pac Bldr Engr
1962
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1962
Yellowtail dam instrumented for structural behavior studies
Engineering Index Backfile | 1964
|Hyraulic Model Studies Yellowtail Afterbay Dam Sluiceway
NTIS | 1982
|British Library Conference Proceedings | 1995
|