A platform for research: civil engineering, architecture and urbanism
Fabrication of steel piles by welding of 14-in. H-beams in continuous lengths up to 195 ft; alignment, assembly and welding procedures; pile driving data, field work and some project details.
Fabrication of steel piles by welding of 14-in. H-beams in continuous lengths up to 195 ft; alignment, assembly and welding procedures; pile driving data, field work and some project details.
Welded piles for pier
Welding Engr
Schutz, H. (author)
Welding Engineer ; 32
1947
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete pier piles
Engineering Index Backfile | 1928
Screw piles support Turkish pier
Engineering Index Backfile | 1948
Pretensioned piles for navy pier
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1932
|Pier on 200-ft piles in N.Y.harbor
Engineering Index Backfile | 1948
|