A platform for research: civil engineering, architecture and urbanism
Illustrations and brief description of work on Lone Star Gas Co line under 16 ft of Trinity River flood water; enough pressure was allowed on line to cause geyser and assist in locating break; work was completed with aid of one diver and "land crew".
Illustrations and brief description of work on Lone Star Gas Co line under 16 ft of Trinity River flood water; enough pressure was allowed on line to cause geyser and assist in locating break; work was completed with aid of one diver and "land crew".
Repairing pipe line in flood waters
Petroleum Engr
Thompson, C. (author)
Petroleum Engineer ; 18
1947
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing a wood-stave pipe-line
Engineering Index Backfile | 1921
|European Patent Office | 2022
|Unusual problems solved in repairing pipe-line river crossing
Engineering Index Backfile | 1946
|